EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Boonton Township, New Jersey. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

Disclaimer: If you would like to bid on this project you MUST obtain bid documents by contacting procurement@suburbanconsulting.com No Bids will be accepted after said hour. The proposed improvements consists of the open cut-trench installation of approximately 1,000 linear feet of new 10-inch diameter PVC sewer main (including precast concrete manholes) along Wootton Street and Park Avenue (including the installation under the I-2817 overpass) as well as the replacement in same trench of approximately 1,000 linear feet of 10-inch diameter sewer main with 12-inch diameter sewer main along Rosseller Street(including precast concrete manholes and sanitary sewer lateral replacement up to the cleanouts). To facilitate the installation, the use of temporary sanitary sewer bypassing and modifications to the tie-in connection manholes would be required. The contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents. The Contract will allow 180 calendar days for completion of the work from the notice to proceed. Written request must contain company name, company address, contact name, contact telephone number, contact fax telephone number, and contact email address in order to receive link to download documents. In submitting this request you will be registered for this bid, only registered bidders will be allowed to submit a bid. One hard copy and one electronic copy of the Bids shall be made on the forms provided and made part of the Contract Documents. A certified check or cashier's check made payable to the order of the Town of Boonton, or a duly executed Bid Bond, in the amount of ten perce nt (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond. Al l applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570 - Surety Companies Acceptable on Federal bonds), incorporated herein by reference. Copies of this document may be obtained from the Department. The successful Bidder will be required to deliver to the Owner an executed Performance Bond of a responsible indemnity company authorized to do business in the State of New Jersey. Bidders are required to comply with the requirements of the New Jersey State Statutes: N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 Affirmative Action Section 1 of P.L.1977, c.33 Statement of Ownership (N.J.S.A. C.52:25-24.2) N.J.S.A. 40A:11-18 American Goods and Products to be Used Where Possible Section 21 of P.L.1971, c.198 Guarantee to be Furnished with Bid (N.J.S.A. C.40A:11-21) Section 22 of P.L.1971, c.198 Surety Company Certificate (N.J.S.A. C.40A:11-22) Section 16 of P.L.1971, c.198 Listing of Subcontractors (N.J.S.A. C.40A:11-16) Section 1 of P.L.2001, c.134 Business Registration (N.J.S.A. C.52:32-44) If awarded a contract, your company/firm is required to comply with requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Bids must be placed in sealed envelopes and delivered in person to the Municipal Building at 100 Washington Street, Boonton, New Jersey 07005 The submitted bid packages shall be complete with the bid description and the name and address of the Bidder marked clearly on the outside of the envelope. The outside of the envelope must contain the name and address of the Bidder and also must identify the bid as professional services for Town of Boonton Sewer System Capacity Improvements The Town of Boonton reserves the right to consider bids for sixty (60) days after their receipt. The right is reserved to waive any informalities, to accept bids which it deems most favorable to the interest of the Town to make an award on each item separately or as a whole and to accept any Bid or to reject any or all Proposals in accordance with the Specifications and the Bid forms. This project is subject to both Davis Bacon wage rate requirements and New Jersey Prevailing wage rate requirements. The contractor shall utilize the higher of the two rates in each and every category of work on the project. This project is expected to be funded in part by New Jersey Department of Environmental Protection (NJDEP) and New Jersey Environmental Infrastructure Trust (NJEIT). Neither the State of New Jersey, the NJEIT nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-,-4,-5,-9 and -10. All federal prevailing wage regulations as well as the Federal Labor Standards Provisions will apply. Attention is called to the fact that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin and to the greatest extent possible, opportunities for training and employment shall be given to lower-income residents of the project area and that, when possible, contracts shall be awarded to business concerns owned by area residents. Small, Minority and Women's Business Enterprises are encouraged to submit bids. Bids for proposals in excess of $100,000 must be accompanied by a written Affirmative Action Plan. Bidders are required to comply with the requirements of P.L. 1975, c. 127. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the Contractor (subcontractor) shall comply with all the provisions of N.J.A.C. 7:22-9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). The successful bidder for the project shall commit to the use of small business concerns owned and controlled by SEDs with a goal of ten percent (10%) of the work value under the contract. All contractors, including SED contractors, shall submit their own SED Utilization Plan to the NJDEP OEOPCA, with a copy to the Owner, within thirty (30) days of the contract award. The contractor's plan shall contain provisions to meet the specific SED Utilization requirements of the contract. The contractor's plan shall outline the entire project or contract work, the estimated time to complete the work, each significant segment of work on which SEDs will or may participate and a description of how SEDs will be contacted. The Contractor shall submit SED Participation Monthly Progress Reports (Form OEO-003) to the Project Compliance Officer and shall submit SED Participation Building Phase Quarterly Reports (Form OEO-002) to the Project Compliance Officer and to the OEOPCA, in accordance with N.J.A.C. 7:22-9.12.

Award

Water / Sewer

$1,870,531.00

Public - City

Site Work

26

7

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees, Planting Accessories, Tree Grates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
547
Active Projects
324
Bidding Soon
5,039
All Active Projects
2,366
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

February 19, 2024

img_map_placeholder

100 Washington St, Boonton Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sewer System Capacity Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.