BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in San Marcos, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a road / highway; water / sewer project; road / highway; and road / highway.

As of March 29, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Reference Number 0000334300 The work consists in general of constructing approximately 1.1 miles of a Class I bicycle facility, located between Civic Center Drive and Mar Vista Drive, in Vista, CA. The Class I bikeway is an 8-foot to 10-foot-wide multiuse bike path that is located mostly within the existing North County Transit District Right-of-Way, parallel to the railroad tracks. This bike path will connect to existing sidewalks or bike paths. Work will include grading, retaining walls, drainage improvements, cold milling asphalt concrete, crushed aggregate base, asphalt concrete paving, landscaping and irrigation, lighting, black chain link fence and gates, water quality swales, signing, and pavement delineation. The additive alternative work is for the CCTV system. In addition, this includes procurement of all materials and performing all other work necessary to complete the work in accordance with the project plans and Special Provisions. -The engineer's estimate for this work for base bid and additive alternative is $14,819,811.15. -The DBE goal is 21%. For the SWPPP, this project is a Risk Level 2. Deadline 02/02/24 at 5:00 PM PT Questions are submitted online Yes Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Contractors License Required - Federally Funded - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10% - 100% - 100%

Bid Results

Sidewalks / Parking Lot

$14,079,543.00

Public - City

Outdoor Lighting, Paving, Site Work

210

22

104

12

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
97
Bidding Soon
2,207
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

April 9, 2024

img_map_placeholder

Inland Rail Trail, San Marcos, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.