BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2024 at 7:00 PM

Updated February 26, 2024

Site work and paving for a civil project in Red Cliff, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Region: 3 CONSTRUCTION PROJECT CODE NO. 24311 Counties: Eagle This Project is on Us 24 South of Minturn and Includes Resurfacing Us 24 From Mp 147 to Mp 156, and Minor Shoulder Widening Us 24 From Mp 148.6 to Mp 152. This Project Also Includes Minor Bridge Rehabilitation, Rock Scaling and Culvert Lining Work Days: 118 This project is located in Region 3 in Eagle County. Project work consists of resurfacing on US 24 from MP 147 to MP 157, and minor shoulder widening from MP 148.6 to MP 153.5. Work will include minor bridge rehabilitation, rock scaling, and culvert lining. Please contact Pete Lombardi at 970-376-6707 for all project related questions. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 Contract UDBE Goal: 4.90% CODOT: 004 - Region 3 - US 24 Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$11,244,775.00

Public - State/Provincial

Paving, Site Work

540

5

17

9

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
33
Bidding Soon
660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

April 3, 2024

Project location map

US-24, Red Cliff, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.