BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Elk Grove, California. Completed plans call for the renovation of a educational facility.

E-Rate Infrastructure Hardware and Installation. The District reserves the right to reject all proposals and not make a decision, or to contract for only a portion of the project. All costs for proposal preparation are the responsibility of the Proposer. Each proposal must conform and be responsive to this invitation; the information for proposers, specifications, and all other documents comprising the pertinent award agreement documents and submitted on the printed forms provided by the District. LIQUIDATED DAMAGES The District shall hold the successful Proposer submitting an RFP liable and responsible for all damages, which may be sustained because of his/her failure to comply with any condition herein. If the successful Proposer submitting an RFP fails to furnish or deliver any materials, supplies, equipment or other services at the price quoted, or at a time and place stated, or otherwise fails to comply with the terms of this RFP in its entirety the agreement will be canceled and, the District may purchase the services herein specified elsewhere, without further notice to the successful Proposer submitting an RFP. Additional cost accrued by the District through this purchase will be deducted from any unpaid invoices. Proposers are advised that the District reserves the right to reject a proposal that cannot demonstrate the ability to provide the services required. Past service and delivery performance with a similar sized organization and scope of work is a factor in the determination of award of this RFP. Proposers' past performance practices and service to the District will be examined. Proposers' who have demonstrated unsatisfactory performance will be subject to disqualification All inquiries regarding this RFP must be submitted in writing to Denise Fong/Thomas Almazan, at tserate@egusd.net no later than 2:00 P.M. Standard, December 8, 2023. Responses to inquiries will be posted no later than December 15, 2023 In accordance with California Labor Code Section 1770 et seq. payment of the appropriate general prevailing rate of wages for all crafts employed on the public works site is required of the Contractor and all subcontractors. Compliance with California Education Code Section 45125.1 mandating fingerprinting requirements applies to this project.

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
84
Bidding Soon
1,738
All Active Projects
725
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

January 22, 2024

img_map_placeholder

Multiple Locations, Elk Grove, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.