BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Ketchikan, Alaska. Completed plans call for site work for a bridge / tunnel.

inquiries about this project should be made to the Public Works Engineer's office st karj@ktn-ak.us Engineers Estimate Range: $1,000,000 - $2,5000,000 City of Ketchikan is requesting sealed bids for the Schoenbar Culvert Rehabilitation, Contract No. 23-26 consisting of furnishing all labor, equipment, materials, supervision, and other facilities necessary to complete the Work set forth in the Contract Drawings and Specifications, and terms of the Contract successfully. The Work that is presented in the Bid Proposal for this Contract generally consists of the rehabilitation of the 8' x 12' x 472' multi-plate arch corrugated metal culvert that conveys the flow of Schoenbar Creek, including dewatering, creek bypass, reconstruction of concrete headwall, injection grouting, invert repair and installation of a spray applied pipe lining system; complying with all State and Federal permits and coordinating work with the Owner. This project has been funded wholly or in part by the United States Environmental Protection Agency under assistance agreement CG-02J26301-0 to City of Ketchikan and Federal Fiscal Funds. Trenchless Rehabilitation Contractors or Subcontractors shall be pre-qualified prior to time of bidding. In order to prequalify the contractor shall submit the prequalification form including all attachments, enclosures and continuation pages electronically to the Clerk's office at no later than close of business on November 15th, 2023. Special Requirements: Minority Owned Businesses (MBEs) and Women Owned Businesses (WBEs) are encouraged to respond. Engineers Estimate Range: $1,000,000 - $2,5000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions related to this prequalification application shall be directed to the Engineer. Final questions due one week before bid opening, December 7th

Award

Bridges / Tunnels

$3,259,620.00

Public - City

Site Work

19

9

11

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
15
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

February 19, 2024

img_map_placeholder

Schoenbar Rd, Ketchikan, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.