BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sandwich, Massachusetts. Conceptual plans call for site work for a water / sewer project.

Additional Market Research for Informational Purposes Only Title: Dredging Nearshore Borrow Area and Beach Nourishment, Town Neck Beach, Sandwich, Massachusetts. W912WJ24X0026 Response date: January 22, 2024 Description: The U.S. Army Corps of Engineers, New England District is issuing supplemental Market Research Questions for Dredging Nearshore Borrow Area and Beach Nourishment, Town Neck Beach, Sandwich, Massachusetts. A sources sought was previously posted to SAM.gov for this project on November 1, 2023. This additional market research will supplement results/responses already received. This project is part of the U.S. Army Corps of Engineers, Continuing Authorities Program - Section 111 Project, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation, Dredging of the Scussett Beach nearshore borrow area northwest of the Canal's north breakwater at the east end of the Canal is needed to amend the beach dune and beach berm profile at Town Neck Beach in Sandwich, Massachusetts. This project will be completed using a hydraulic dredge and pipeline and consists of removing a total of about 277,000 CY of sand from the Scussett Beach Borrow Area (SBBA). Dredging within the established footprint of the SBBA will be to a maximum elevation of -18' Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach's required beach berm and dune profile. The Government is providing a DRAFT version of a selected portion of the project specifications and drawings for industry review and comment. These documents are in draft format only and are subject to change if/when a solicitation for this project is released. The Government is interested in industry's response to the following question (but additional comments will be accepted). The Government will consider all responses but is not required to make any changes as a result of the comments received. Question: Does industry see any concerns with installing and laying up to 2 miles of submerged hydraulic pipeline along the seabed that includes the crossing of an active federal navigation channel, anchoring of submerged pipeline to seabed, and routine underwater inspections of submerged pipeline to ensure no leaks and anchoring to seabed is maintained Submerged pipeline(s) crossing the East Entrance Channel shall be set at a minimum depth of -38 feet mean lower low water (MLLW), measured to the top of the hydraulic pipeline. Firms shall provide responses via email and are due by 2pm Eastern, 1/22/2024. Responses should be emailed to: ann.m.adley@usace.army.mil . The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, U.S. Corps of Engineers The Method of Contractor Selection has not been determined at this Time.

Conceptual

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
279
Bidding Soon
3,342
All Active Projects
1,432
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 5, 2025

March 15, 2025

img_map_placeholder

To Be Determined, Sandwich, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.