Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 15, 2023 at 7:00 PM
Updated January 27, 2024
Renovation of an educational facility in South Jordan, Utah. Completed plans call for the renovation of a educational facility.
Elk Meadows Elementary Roof Replacement Remove roofing assembly to lower layer of existing SBS Roofing - additional layer of insulation - additional curb heights: Shall consist of providing all labor, material, and related items to remove existing SBS roofing to top of existing rigid insulation. Add an additional layer of rigid insulation over existing roofing insulation, raise existing curbs and walls as required per new insulation thickness and provide a new 80 mil. All questions, interpretations, or clarifications regarding this solicitation shall be submitted through Periscope S2G and are subject to the deadline for submitting questions before November 9, 2023 at 12:00 P.M JSD reserves the right to waive or modify any of the foregoing requirements when it appears to be in their best interest to do so. Nothing contained herein shall relieve any Contractor from the obligation to comply with all other documents or requirements connected with the bidding process and awarding of the contract to the satisfaction of JSD. Site work may commence as early as June 3, 2024. Work must be substantially completed by August 13, 2024. A construction schedule must be approved before commencing work by JSD representatives at the pre-construction meeting. Bidders shall attach a bid bond or cashier's check, payable to the order of Jordan School District in the amount of five percent (5%) of the total bid price. The purchase order will not be transmitted to the Contractor and work cannot begin until the original payment and performance bonds have been received by the JSD Purchasing Department. Bonding costs must be included in the bid price. Liquidated damages for a missed deadline are set at one thousand dollars ($1,000) per day for each and every calendar day past the completion date.
Award
Educational
$400,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed