BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2023 at 7:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project includes, but is not limited to, the following major work items: pavement removal; preparation of base; water main replacement and related appurtenances; water service lines; storm sewer improvements and spot repairs; curb and gutter, and sidewalk removal and replacement at various locations; hot-mix asphalt binder and surface course(s); parkway restoration; and other appurtenant work for a total distance of 1.2 miles on White Pine Road, Elmwood Drive, Red Oak Court, Hawthorne Road, Thornwood Drive, Poplar Court, Evergreen Place, and Sycamore Road in the Village of Buffalo Grove. State of Illinois, Department of Transportation, Contractor Pre Qualification and Subcontractor Pre-Qualification/Registration is required. Bid security in the form of a Bid Bond, Bank Cashier s Check or Certified Check in the amount of TEN (10) percent of the total bid amount made payable to the Village of Buffalo Grove shall accompany the bid. The Village of Buffalo Grove reserves the right to reject any and all bids and bidders and to waive all technicalities. All bid proposals submitted shall be valid for a period of one hundred twenty (120) days.

Bid Results

Roads / Highways

$3,443,587.00

Public - City

Paving, Site Work

21

10

29

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
290
Bidding Soon
3,790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

January 15, 2024

Project location map

Multiple Locations, Buffalo Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.