BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Willowbrook, Illinois. Contact the soliciting agency for additional information.

This project requires 20% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 24, 2024, at 1:00 PM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for the preparation of contract plans, structure plans, specifications, cost estimates, supplemental surveying, geotechnical services, lighting design, and all other work necessary to complete the improvements to Northbound Interstate 55 (I-55) from East of Illinois Route 50 (Cicero Avenue) to the Chinatown Feeder. The project scope involves bridge repairs and improvements, bridge deck overlays, bridge joint repair and replacement, patching and resurfacing, crack and joint sealing, barrier wall repair and replacement, drainage, landscaping, signboard and sign structure repair and replacement, lighting modernization, and ITS and surveillance equipment improvements. The completion date for this contract will be 24 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 12 - RFQ - Northbound I-55 from East of Illinois Route 50 (Cicero Avenue) to the Chinatown Feeder, Phase II Project

Conceptual

Roads / Highways

$60,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
224
Bidding Soon
3,175
All Active Projects
1,355
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 17, 2024

July 17, 2026

img_map_placeholder

I-55, Willowbrook, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.