Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 29, 2024 at 7:00 PM
Updated March 1, 2024
Site work and paving for a mixed-use development in Saint Johns, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
As of February 28, 2024, the project has been awarded and construction is expected to commence July 8, 2024, however, an exact timeline for completion has not been confirmed Bridge rehabilitation including substructure patching, concrete curb, gutter and spillway and scour countermeasures on US-127 over Ferdun Creek, Clinton County. Net classification required for this project is 671 Fa Control Sec Job No Federal No M 19032 212674A N/A MI DOT - 2312 026 - Bridge Rehabilitation Including Substructure Patching, Concrete Curb, Gutter and Spillway and Scour Countermeasures on US-127
Award
Bridges / Tunnels
$948,008.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2023
July 8, 2024
US-127, Saint Johns, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
