BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2024 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a civil project in Perry, Florida. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Counties: Tayor Road Name: Dennis Howell Rd Limits: Over Warrior Creek, Bridge No. 384029 Project(s): 43742315201(*) Federal Aid No: D223036B Total Roadway Length: 0.000 Miles Contract Days: 180 Total Bridge Length: 0.099 Miles Total Proposal Length: 0.099 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 days Description: The Improvements under this Contract consist of base work, shoulder treatment, drainage improvements, guardrail, box culverts and other incidental construction on Dennis Howell Road in Taylor County over Warrior Creek. Question Deadline 11/29/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 008: Bridge Replacement - Dennis Howell Rd

Award

Bridges / Tunnels

$3,145,365.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

93

3

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
39
Bidding Soon
560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

December 16, 2023

Project location map

Dennis Howell Rd, Perry, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.