BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in West Palm Beach, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Broward Road Name: North Shore Dr Limits: From S of the Carver Canal to N of the Carver Canal Project(s): 44001515201(*) Federal Aid No: D423054B Total Roadway Length: 0.000 Miles Contract Days: 182 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.070 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 days Description: The Improvements under this Contract consist of, but are not limited to, concrete structures (approach slabs, bridge substructure, gravity walls), reinforcing for concrete (reinforcing steel), structures foundations (auger cast piles), structural steel (prefabricated pedestrian bridge), metal pedestrian/bicycle railings, revetment systems (rubble rip rap, bedding stone), MOT (standard, temporary low profile barrier), erosion control (sediment barrier, floating turbidity barrier), monitor existing structures (inspection, settlement, vibration), clearing (tree protection, tree trimming, tree removal, drainage structure removal), concrete (removal, curb and gutter, sidewalk, driveways), earthwork (regular and channel excavation, embankment, stabilization), drainage (inlets, manholes, pipes, yard drain), signing (single-post, removals), lighting (luminaire, pole complete, cable distribution, conduit, pull boxes), fencing and sod along North Shore Drive from south of the Carver Canal to north of the Carver Canal, for 0.07 miles in the City of West Palm Beach, Palm Beach Count Question Deadline 11/29/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 018: Pedestrian/Wildlife Overpass (Bridge) - North Shore Dr

Award

Roads / Highways

$2,710,165.00

Public - State/Provincial

Paving, Site Work

57

7

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
119
Bidding Soon
1,767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

February 5, 2024

Project location map

N Shore Dr, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.