Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Halfway, Oregon. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of December 10, 2024, this project is at the very beginning of the design process. A construction timeline has not been established but bidding is not anticipated until Summer 2026. The proposed Project includes the design of a new bridge to replace one washed away in a flood including appropriate roadway approaches on Holbrook Creek Road. The Project also includes modification to the stream bed that was significantly expanded during the flood event. Project Location: Region 5, Baker County (Tier 2 Local Agency) ODOT Key Number: 22017 DBE Participation Goal: 8.5% [NOTE: Only Consultants that have been awarded a PA in the above PA series may respond to this Mini-RFP.] Work Order Contract (WOC) Assignment Under Full Service A&E Price Agreement (PA) series Tier A PA Holders Oregon Department of Transportation (Agency or ODOT) is requesting supplemental information regarding specific A&E and Related Services experience relevant to the above referenced public improvement or public works project (the Project). The needed Services are further described in the attached Statement of Work (SOW). The expected outcome of the WOC is to provide design services from Design Acceptance Plans (DAP) to Final Plans, Specifications & Estimates (PS&E), as well as, construction engineering support or Contract Administration/Construction Engineering Inspection (CA/CEI) if required during the construction phase of the Project. Proposers responding to the Mini-RFP do so solely at their expense. Agency is not responsible for any Proposer expenses associated with the Mini-RFP. The selected Proposer and Agency will negotiate the delivery schedule, costs and final Statement of Work, within the scope of what is advertised here, for inclusion in the final WOC. The WOC is anticipated to start Winter 2023-24 and is expected to be completed by summer of 2025. Pending successful negotiations, the selected Proposer shall perform its obligations according to the WOC and applicable terms and conditions of the parent PA and exhibits thereto. Agency anticipates the construction budget for this Project will not exceed $1,800,000. ODOT in accordance with the Title VI of the Civil Rights Act of 1964, 78 Stat. 252. 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all Bidders that it will affirmatively ensure that all business enterprises will be afforded full opportunity to submit bids in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The method of Contractor Selection has not been Determined at this time.
Design
Bridges / Tunnels
$1,800,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2026
Holbrook Creek Rd, Halfway, OR
Related To This Project
Halfway, OR
Bid Date: Apr 24 2024
Halfway, OR
--
Halfway, OR
Bid Date: Jun 20 2022
Sandy, OR
Bid Date: Dec 04 2023
Oregon City, OR
Bid Date: Jan 31 2024
Warrenton, OR
Bid Date: Dec 21 2023
Myrtle Creek, OR
Bid Date: Dec 15 2023
Portland, OR
Bid Date: Dec 04 2023
Eugene, OR
Bid Date: Nov 21 2023
Salem, OR
Bid Date: May 13 2024
Salem, OR
Bid Date: Nov 09 2023
Grants Pass, OR
Bid Date: Nov 30 2023
Gresham, OR
Bid Date: Nov 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.