EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 1, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Seaford, New York. Completed plans call for the renovation of a educational facility.

The work shall be as follows: Contract #1- General construction Contract #2- Plumbing reconstruction Contract #3 HVAC reconstruction Contract #4 Electrical reconstruction SED # 28-02-06-03-7-024-001- Field house construction Each Bidder must deposit, with their sealed bid, security in an amount not less than 10% of the base bid and all Alternate Bids in the proper form subject to the conditions set forth in the Instructions to Bidders (Page 3). Attention of the Bidders is specifically directed to the minimum wage rates to be paid under the contract, as well as to other provisions set forth in the bidding documents. Bidder will also be required to show, to the satisfaction of the SEAFORD UFSD that they are carrying Workers' Compensation Insurance as required by law and all other Insurance in amounts not less than that specified under the General Conditions. Performance Bonds Labor/Material Bonds and Maintenance Bond, as called for in the General Conditions are a requirement of each contract. The SEAFORD UFSD reserves the right to reject any or all bids submitted, to waive any informality or irregularity in any bid, and/ or to accept any bid in whole or in part and/ or to award or not award the contract, if in the opinion of the SEAFORD UFSD, the best interest of the SCHOOL DISTRICT will thereby be served. This invitation is an offer to receive bids for a contract. The successful Bidder will be required to execute a formal contract in the form contained in the Contract Documents. All bids received after the time stated in the Notice to Bidders will not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of the SCHOOL DISTRICT. Whether sent by mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the place specified. Each Bidder shall agree to hold their bid price for (45) days after the formal bid opening.. Per Article 8, Section 220 of the New York State Labor Law, every contractor and sub-contractor shall submit to the SCHOOL DISTRICT within (30) days after issuance of its first payroll, and every (30) days thereafter, a transcript of the original payroll record, as provided by this article, subscribed and affirmed as true under penalties of perjury. The SCHOOL DISTRICT shall be required to receive and maintain such payroll records. The original payrolls or transcripts shall be preserved for (5) years from the completion of the work on the project. Bid documents info : Checks for deposits shall be made payable to the SEAFORD UFSD. All bid addenda will be transmitted to registered plan holders via email and will be available at the websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit shall be refunded to each Bidder only if the plans and specifications are returned, in good condition, with no handwritten notations thereon within (45) calendar days after the bid opening date. All deposits shall be forfeited to the School District after the (45) days have elapsed. If you have any questions concerning the Fair Play Act, please call the State Labor Department toll-free at 1-866-435-1499 or email us at: dol.misclassified@labor.ny.gov . This Contractor shall supply all the labor, material and equipment necessary to remove & legally dispose of all doors, frames & hardware, and install new doors, including but not limited to: A. Exterior aluminum thermally broken frames B. Exterior aluminum doors C. Exterior FRP Doors D. Trim, casings, closures and similar pressed metal work Bid Result - Contract #1- General construction - Renu - 957000 Contract #2- Plumbing reconstruction - Seaford - 127600 Contract #3 HVAC reconstruction - Traditional - 51000 Contract #4 Electrical reconstruction - Palace - 103000

Bid Results

Educational

$1,238,600.00

Public - City

Renovation

16

23

6

12

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Plastic Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Wall Finishes, Wall Coverings, Special Wall Surfacing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Retaining Walls, Irrigation, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
244
Bidding Soon
4,653
All Active Projects
1,879
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

January 15, 2024

img_map_placeholder

Multiple Locations, Seaford, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023/2024 Capital Improvement Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.