Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 31, 2024 at 7:00 PM
Updated February 1, 2024
Site work and paving for a civil project in Lake Roesiger, Washington. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
This project has been cancelled. Design-Build Project. Remove three fish barriers and replace them with fish-passable crossings at SR 92 Lundeen Creek WDFW (#991827), SR 204 UNT to Ebey Slough (WDFW #995138), and SR 528 Munson Creek (WDFW #990294). The project shall include, but is not limited to, the following: Design and construction of fish passable water crossing and structures, including all associated stream restoration. Acquisition of environmental permits. Temporary and permanent utility adjustment and relocation. Other elements including, but not limited to embankment, grading, paving, storm drainage, signing, illumination, erosion control, and planting. The RFQ will be advertised on November 13, 2023. A Voluntary Submitters Meeting is scheduled for November 21, 2023, via an online audio/video using Microsoft Teams. An invite notice will be available on the WSDOT website at: https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-92-sr-204- sr-528-fish-passages. County Snohomish County Estimated value $25,000,000 - $30,000,000 A state funded project with a 5% condition of award Small Business Enterprise goal and a 3% condition of award Veteran Owned Business goal Conrad Guadagni Assistant Project Engineer conrad.guadagni@wsdot.wa.gov 206-440-4278 WADOT - RFP D/B - SR 92, SR 204 and SR 528 - Fish Passages The purpose of this Project is to remove three (3) existing fish barriers and replace them with fish-passable crossings, and one (1) weir removal at the following locations: Route Milepost (MP) WDFW Site ID Creek Name SR 92 0.78 991827 Lundeen Creek to Lake Stevens SR 204 0.54 995138 UNT to Ebey Slough SR 528 2.51 990294 Munson Creek to Allen Creek MBE (10%), WBE (6%), DVBE (3%), SBE (5%)
Final Planning
Bridges / Tunnels
$30,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
