Published February 29, 2024 at 7:00 PM
Updated October 1, 2024
Site work, new construction and renovation of a civil project in Lynnfield, Massachusetts. Completed plans call for the construction of a 5,600-square-foot water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
The project includes the construction of a new 0.8 million gallon per day (MGD), 5,600 SF water treatment plant (WTP) and rehabilitation of pump station for existing water sources. The WTP will include radon removal, new high lift pumps, greensand pressure vessels, granular activated carbon (GAC) pressure vessels, chemical feed systems, backup generator and associated building mechanical. The completed project is needed for long-term PFAS compliance, and will mitigate PFAS with the required iron, manganese and radon removal prior to the GAC. This RFQ is the first phase of a two-phase procurement process as set forth in M.G.L. c. 149. The Awarding Authority through its Prequalification Committee is prequalifying firms interested in providing public General (GC) Contractor services and Trade Subcontractor services through this RFQ process. RFQ questions deadline (in writing) by 11/17/23 5:00 P.M.. Response to questions (if applicable) provided by 11/27/23 @ 5:00 P.M. DCAMM certification (as applicable); 4.2% D/MBE participation; 4.5% D/WBE participation; Estimated project duration is 550 calendar days from Notice to Proceed The estimated project cost is $14,700,000.00. The project includes, but is not necessarily limited to, construction of a 5,600 square foot (SF) building with two (2) greensand filtration pressure vessels, two (2) granular activated carbon (GAC) contact pressure vessels, one (1) backwash storage tank, backwash pumps, chemical storage room, electrical room, mechanical room, bathroom, laboratory space, control room, and associated building support systems. The site will also contain an enclosed aeration system for radon treatment, a pair of settling lagoons with an infiltration basin, emergency generator, septic system, tight tank, and injection well. Modifications will be made to the existing pump station, including demolition of the chemical feed systems, electrical equipment, and replacement of the high lift pumps. The Contract Time shall be 600 Calendar Days commencing twenty days following the Effective Date of the Agreement. Question Deadline 02/12/2024 All questions about the meaning or intent of the Contract Documents shall be received in writing by Weston & Sampson, 55 Walkers Brook Drive, Suite 100, Reading, MA 01867 or huttonj@wseinc.com Attn: Jeff Hutton Bid Result. MASONRY:B & B Commercial Masonry Inc $304,450.00 MISCELLANEOUS:[Methuen Construction Co $75,676.00 ROOFING AND FLASHING:[Waterline Industries Corp $67,577.00 PAINTING: Soep Painting Corporation, $104,405,00 FIRE PROTECTION:William M, Collins Co. Inc $125,745,00 PLUMBING: Araujo Bros Plumbing & Heating $416,000,00 HVAC: Waterline Industries Corp $1,057,677.00 ELECTRICAL: Wayne J. Griffin Electric Inc, $1,649,000.00
Bid Results
Water / Sewer
$3,800,530.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2024
March 25, 2024
Multiple Locations, Lynnfield, MA
Related To This Project
Lynnfield, MA
Bid Date: Dec 05 2023
Lynnfield, MA
Bid Date: Mar 21 2024
Lynnfield, MA
Bid Date: Nov 28 2023
Lynnfield, MA
Bid Date: Dec 04 2023
Lynnfield, MA
--
Lynnfield, MA
Bid Date: Dec 13 2023
Lynnfield, MA
Bid Date: Jan 11 2024
Lynnfield, MA
Bid Date: Dec 13 2023
Lynnfield, MA
Bid Date: Nov 08 2023
Lynnfield, MA
Bid Date: Nov 30 2023
Lynnfield, MA
Bid Date: Oct 11 2023
Lynnfield, MA
Bid Date: Oct 11 2023
Lynnfield, MA
Bid Date: Oct 18 2023
Lynnfield, MA
Bid Date: Oct 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.