BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Walnut, California. Working plans call for the renovation of a educational facility.

***As of January 17, 2024. The College has rejected all bids for this project and will be re-bidding at a later date. RFI Deadline: November 28, 2023, 2:00pm 6. Prevailing Wage Rate ("PWR") Monitoring and Enforcement. The Work is subject to payment of PWRs. The Contractor and all Subcontractors of every tier shall pay laborers performing any portion of the Work not less than the PWR established for the labor provided. Pursuant to Labor Code 1771.4(a)(4), PWR monitoring and enforcement shall be by the Department of Industrial Relations. 7. Contractor's License Classification. In accordance with the provisions of California Public Contract Code 3300, the District requires that Bidders possess, at the time of submission of a Bid Proposal, at the time of award of a Contract for a Bid Package and at all times during the Work, the following classification(s) of California Contractors Licenses: C10 - Electrical. No payment shall be made for work, labor, materials or services provided under the Contract for the Work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed to perform the Work. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law. 8. DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials, and/or services ("Work") subject to this procurement must be a Department of Industrial Relations registered contractor pursuant to Labor Code 1725.5. A Bidder who is not a DIR Registered Contractor when submitting a proposal for the Work is deemed "not qualified" and the proposal of such a Bidder will be rejected for non-responsiveness. Pursuant to Labor Code 1725.5, all Subcontractors identified in a Bidder's Subcontractors' list shall be DIR Registered Contractors. If awarded the Contract for the Work, at all times during performance of the Work, the Bidder and all Subcontractors, of any tier, shall be DIR Registered Contractors. 9. Bidder's Qualifications. Bidders are to submit a completed Section 00340 - Statement of Qualification, which must be uploaded with the project. 10. Contract Time. The date(s) for completion of Interim Milestones and for achieving Final Completion of the Work of each Bid Package shall be as set forth in the Supplemental Conditions. Failure to complete designated portions of the Work, including Interim Milestones, within the time(s) established in the Supplemental Conditions for each Bid Package and/or failure to achieve Final Completion of the Work within the Contract Time established in the Supplemental Conditions for each Bid Package shall subject the Contractor to assessment of Liquidated Damages as set forth in the Supplemental Conditions. 11. Bid Package Construction Budget. For purposes of the District's determination of the lowest priced Bid Proposal and for inclusion in the scope of a contract for a Bid Package, the Construction Budget established by the District for this Bid Package is listed in the Scope of Work. 12. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount not less than ten percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). A copy of the Bid Security must be uploaded with the bid submittal via Mt. SAC's eProcurement Portal before the date and time of bid closing. 13. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of ninety (90) days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. 14. Substitute Security. In accordance with the provisions of California Public Contract Code 22300, substitution of eligible and equivalent securities for any monies withheld by the District to ensure the Contractor's performance under the Contract will be permitted at the request and expense of the Contractor and in conformity with California Public Contract Code 22300. The foregoing notwithstanding, the Bidder to whom the Contract is awarded shall have ten (10) days following action by the District's Board of Trustees to award the Contract to such Bidder to submit its written request to the District to permit the substitution of securities for retention under California Public Contract Code 22300. The failure of such Bidder to make such written request to the District within said ten (10) day period shall be deemed a waiver of the Bidder's rights under California Public Contract Code 22300. 15. Waiver of Irregularities. The District reserves the right to reject any or all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding. 16. Award of Contract. The Contract for the Work, if awarded, will be by action of the District's Board of Trustees to the responsible Bidder submitting the lowest responsive Bid Proposal. If Alternate Bid Items are included in the bidding, the lowest priced Bid Proposal will be determined on the basis of the Base Bid Proposal or on the Base Bid Proposal and the combination of Alternate Bid Items selected in accordance with the applicable provisions of the Instructions for Bidders. 17. Disabled Veteran Business Enterprises ("DVBE") Participation Goal. Pursuant to Military & Veterans Code 999.2, the District has established a Good Faith Participation Goal for DVBEs of three percent (3%) of the value of the Work. The District's DVBE Participation Policy ("DVBE Policy") is set forth in the Contract Documents. The responsible Bidders submitting the three (3) lowest priced responsive Bid Proposals shall submit to the District, within the time established in the DVBE Policy, DVBE Worksheets establishing achievement of the DVBE Participation Goal or Good Faith Efforts to achieve the DVBE Participation Goal. Failure of any such Bidders to comply with the DVBE Worksheet submission requirements will result in rejection of the Bidder's Bid Proposal for non-responsiveness. 18. Inquiries and Clarifications. This document is for informational purposes and shall not relieve the Bidder of the requirements to fully familiarize itself with all the factors affecting the Project and its Bid. The Bidder is advised that all inquiries and clarifications about the Bid Documents, Drawings, Specifications, etc. shall be submitted to the District via Mt. SAC's eProcurement Portal on or before the above stated date. The District will respond at its earliest possible opportunity. Each Bid Proposal shall be accompanied by Bid Security in the form of: (a) cash, (b) a certified or cashier's check made payable to the District or (c) a Bid Bond, in the form and content attached hereto in the amount of not less than Ten percent (10%) of the total bid price, inclusive of any additive Alternate Bid Item(s) and shall be given as a guarantee that the bidder, if awarded the contract, will execute the agreement within Five (5) working days after notice of award of the contract. Any electronic bid may be withdrawn via the vendor portal at any time prior to the scheduled closing time for receipt of bids. The bid security for a bid withdrawn prior to the scheduled closing time for receipt of bids, in accordance with this paragraph, shall be returned. The Agreement, which the successful Bidder, as Contractor, will be required to execute along with the forms and amounts of the Labor and Material Payment Bond, Performance Bond and other documents and instruments which will be required to be furnished are included in the Contract Documents and shall be carefully examined by the Bidder. The required number of executed copies of the Agreement and the form and content of the Performance Bond and the Labor and Material Payment Bond and other documents or instruments required at the time of execution of the Agreement are specified in the Supplemental Conditions. Completion of the entire work: The work shall be commenced on the date stated in the District's notice to the Contractor to proceed (which date will not be less than five (5) consecutive calendar days from and after the date of execution of the contract) and shall be completed (Final Completion) within 80 calendar days from and after the date stated in such notice (Reference Article 7 of the General Conditions). Estimated Construction Start date: 02/02/2024 Estimated Construction End date: 05/30/2024 Engineer's Base Bid Estimate: 100,000 Allowance: NA Total with Allowance: $100,000 Tiffany Chen Procurement Specialist 1100 N Grand Ave Walnut, CA 91789 Email: tchen138@mtsac.edu Phone: (909) 274-5514

Final Planning

Educational

$114,965.00

Public - State/Provincial

Renovation

14

10

14

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
224
Bidding Soon
3,663
All Active Projects
1,671
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 19, 2023

July 18, 2024

img_map_placeholder

1100 N Grand Ave, Walnut, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.