BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of a military facility in Fairchild Air Force Base, Washington. Completed plans call for the renovation of a military facility.

Remove & Replace existing underground supply & return duct system, old inefficient AHU and failing distribution system. Contractor will install ducted return, update energy efficiency measures and connect to EMCS system. Project based upon 100% completed design by AECOM. Requiring Activity: WA Air National Guard, 141st Air Refueling Wing Civil Engineering Squadron, 1415 W El Paso Ave, FAFB WA 99011. Period of Performance 180 days. 1.) 100% Small Business Set-Aside 2.) NAICS Code: 236220 - Commercial & Institutional Building Construction 3.) Project Magnitude: Between $1,000,000 to $5,000,000.00 4.) Small Business Size Standard: $45,000,000 5.) Site Visit: 14 Dec 2023 at 0900 hrs PST (see section 00 10 00 for instructions) 6.) Questions due NLT 2 Jan 2024 0700 hrs PST. 7.) Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available. ATTACHMENTS Attachment 1 Combined Drawings - B456 Attachment 2 Combined Specifications - B456 Attachment 3 Solicitation Attachment 4 Mechanical Control Diagrams Attachment 5 DDC System for HVAC Attachment 6 Sequence of Operations Attachment 7 Specifications - Table of Contents Attachment 8 Addendum A. The Project consists of, but is not limited to, repair of HVAC systems in Building 399. B. The Work includes, but is not limited to, removing, and replacing the existing failed underground supply and return duct system, replacing the existing air handling unit, and replacing the existing distribution system. In addition to new ductwork and equipment, energy efficiency measures will be updated and connect to the EMCS system. C. The site of the work for this Project is Fairchild Air Force Base. D. All work shall be done in accordance with this specification, project drawings and provisions of this contract. E. All work is to be performed while the building remains occupied (unless the building is specified to be vacant). Scheduling, as described within these documents, shall be achieved to accommodate this occupation. For airfield work, special conditions apply; contact 92 CES/CEN for these requirements. See also Section 013520, Safety Requirements, Para 1.04. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Military

$1,220,509.00

Public - Federal

Renovation

126

52

67

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
17
Bidding Soon
339
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

March 18, 2024

Project location map

1415 El Paso Ave, Fairchild Air Force Base, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.