EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 11, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Pembroke, Maine. Completed plans call for the renovation of a educational facility.

Replace all windows in the main building excluding the large windows in the gymnasium. Total unit quantity of 17. Windows are Marvin Essential line and to be provided by Pembroke Elementary School. Follow all window manufacturer installation requirements. Replacement windows to have 5/4" x 4" trim added to exterior. Exterior trim to be Azek brand PVC, or equivalent. Any clapboards replaced shall be painted minimum of two coats in addition to primer. All cut ends shall be primed and painted. If any clapboards are replaced they shall be pre primed clear vertical grain cedar clapboards. Aluminum drip cap at all window/casing heads. All fasteners at exterior are to be stainless steel. Space between windows and rough opening shall be sealed/insulated. Replace all interior trim to match existing. Prime and minimum of 2 coats of paint at interior trim. All construction debris to be removed from site and properly disposed. Including the existing windows. The Pembroke School Committee Reserves the Right To Accept or Reject Any/all Bids

Award

Educational

$11,520.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
22
Bidding Soon
154
All Active Projects
75
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

June 1, 2024

img_map_placeholder

36 US-1, Pembroke, ME


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pembroke Elementary School Window Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.