Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Owasso, Oklahoma. Completed plans call for site work for a water / sewer project.
The Work includes, but is not limited to, furnishing all labor, materials, equipment, supplies and services for approximately 5,000 lineal feet of cured-in-place pipe lining; protruding lateral removal, 25 sewer manhole rehabilitations; and all associated Work complete in place as shown or specified. Each Bid Must Be Accompanied by a Bid Bond Payable to the Owasso Public Works Authority for Five Percent (5%) of the Total Amount of the Bid. As Soon as the Bid Prices Have Been Compared, the Authority Will Return the Guaranty to All Except the Three Lowest Responsive Responsible Bidders. When the Agreement is Executed, the Guaranty of the Two Remaining Unsuccessful Bidders Will Be Returned. The Guaranty of the Successful Bidder Will Not Be Returned Until the Performance and Statutory Payment Bonds Have Been Executed and Approved, After Which It Will Be Returned. A Certified Check or Bid Bond May Be Used as a Bid Bond. Performance and Statutory Payment Bonds in the Amount of 100 Percent (100%) of the Contract Price, With a Corporate Surety Approved by the Owasso Public Works Authority, Will Be Required for the Faithful Performance of the Contract. Attorneys-in-fact Who Sign the Bid, and Performance and Statutory Payment Bonds Must File With Each Bond a Certified and Effective Dated Copy of Their Power of Attorney. Important: Surety Companies Executing Bonds Must Appear on the Treatury Departments Most Current List and Be Authorized to Transact Business in the State Where the Project is Located All bidders and owners shall comply with the Oklahoma PCBA of 1974. BIDDER agrees that the Work shall be completed under the following contract times: Milestone 1 - Substantial Completion All Work on the Elm Creek Sanitary Sewer Interceptor Rehabilitation shall be substantially completed within 120 calendar days of the Notice-to-Proceed. For this portion of the Work, substantial completion shall be defined as completion of all work including curedin-place pipe lining; manhole lining; including material testing reports and post CIPP closed circuit television inspections. The project shall be considered substantially complete when the post-installation videos have been reviewed and approved by the ENGINEER. Any defects found on the videos must be corrected prior to substantial completion being declared. Milestone 2 - Final Completion All remaining Work shall be completed within 150 calendar days of the Notice-to-Proceed. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement. To avoid bypassing of raw sewage during construction, the contractor shall use the methods and/or schedule(s) described in these Specifications. Owner reserves the right to reject any or all Bids, including, without limitation, any or all nonconforming, nonresponsive, unbalanced or conditional Bids, and reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to the Bidder, whether because the bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner also reserves the right to waive all information not involving price, time or changes in the Work and to negotiate contract terms with the successful Bidder. Discrepancies between multiplication of units of Work and unit prices will be resolved in favor of unit prices being correct. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between the words and figures will be resolved in favor of the words being correct. Estimate is $500k+ Question Deadline 11/27/2023
Award
Water / Sewer
$1,182,640.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2023
January 11, 2024
Elm Creek, Owasso, OK
Related To This Project
Owasso, OK
Bid Date: Dec 12 2023
Owasso, OK
Bid Date: Nov 28 2023
Owasso, OK
--
Owasso, OK
Bid Date: Dec 13 2023
Owasso, OK
Bid Date: Jan 17 2024
Owasso, OK
Bid Date: Feb 06 2024
Owasso, OK
Bid Date: Mar 07 2024
Owasso, OK
--
Owasso, OK
Bid Date: Dec 12 2023
Owasso, OK
Bid Date: Nov 16 2023
Owasso, OK
Bid Date: Dec 06 2023
Owasso, OK
Bid Date: Jun 26 2019
Owasso, OK
Bid Date: Jun 18 2019
Owasso, OK
Bid Date: Jun 26 2019
Owasso, OK
Bid Date: Oct 09 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.