BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Site work and paving for a civil project in Sour Lake, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project scope for the Base Bid includes but is not limited to: South Fannin Street Roadway o Acquire any necessary permits o Mobilize and prepare site o Install traffic control Remove existing concrete road section Excavation to the proper grade to accept new base material o Install, compact and prime new flexible base Complete base repairs as shown in the plans Sweep and tack roadway and construct new HMAC surface o Install new side road tie-ins and driveway transitions Backfill pavement edges o Clean up site The project scope for the Alternate Bid #1 includes but is not limited to: Shady Lane Roadway o Acquire any necessary permits o Mobilize and prepare site o Install traffic control Excavate for widening areas as shown in the plans o Install new flexible base for widening areas o Pulverize, mix, shape and compact existing roadway o Apply prime coat o Construct HMAC surface and driveway transitions Backfill pavement edges o Clean up site The project scope for the Alternate Bid #2 includes but is not limited to: Shady Lane Drainage o Acquire any necessary permits o Mobilize and prepare site o Install traffic control o Notify residents prior to construction activities o Excavate roadside ditches to the line and grades shown in the plans o Remove and replace culverts as shown in the plans o Repair driveways back to original condition as shown in the plans o Seed/hydro mulch disturbed areas o Clean up site

Award

Roads / Highways

$216,092.00

Public - City

Paving, Site Work

13

11

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
4
Bidding Soon
1,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 5, 2024

Project location map

Multiple Locations, Sour Lake, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.