BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Luis Obispo, California. Completed plans call for site work for a water / sewer project.

**As of January 2 2024, this project has not yet been awarded. The project is expected to be awarded on January 9, 2024.** This project consists of installing hydraulic barriers in various portions of the compromised levee to protect against seepage and prevent further erosion. all Requests for Information must be submitted no later than 3:00 p.m., 5 business days (12/1/23) prior to the bid opening date. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: A Goals for minority participation for each trade: 24.6% B. Goals for female participation in each trade: 6.9% These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. Each Bid shall be accompanied by Bid Security consisting of: (a) cash; (b) a certified check made payable to the District; (c) a cashier's check made payable to the District; or (d) a bidder's bond in favor of the District executed by the bidder as principal and surety as obligor, in an amount not less than 10% of the total Bid. The surety insurer shall be admitted to transact surety business in the State of California, as defined in Code of Civil Procedure section 995.120. Personal sureties and unregistered surety companies are unacceptable. The cash, check, or bidder's bond shall be given as a guarantee that the bidder: (1) will execute the Contract if it is awarded to the bidder, and (2) shall provide the required payment and performance bonds and insurance certificates and endorsements as required by the Contract Documents. Failure to provide the required documents may result in forfeiture of the Bid Security and the District may award the Contract to another bidder or may call for new Bids. The successful bidder shall deliver to the District two (2) fully executed, identical counterparts of the performance bond and payment (labor and materials) bond in the form supplied by the District and included in the Contract Documents. The penal amount of each bond shall be for one hundred percent (100%) of the total Contract Price. The surety insurer shall be admitted to transact surety business in the State of California, in accordance with Code of Civil Procedure section 995.120. Personal sureties and unregistered surety companies are unacceptable. Failure to furnish a bond within this time may, in the sole discretion of District, result in the forfeiture of the Bid Security. The District reserves the right to reject any or all bids, and to waive discrepancies, irregularities, informalities, or any other error in the bid or bidding, if to do so seems to best serve the public interest. The right of the District to waive errors applies even if the Contract Documents state that a discrepancy, irregularity, informality, or other error make a bid nonresponsive, so long as the error does not constitute a material error. THESE DRAWINGS PROVIDE THE ENGINEERING DETAILS TO RESTORE AREAS OF LEVEE INTEGRITY IN THE ARROYO GRANDE CREEK CHANNEL BY FLOOD CONTROL ZONE 1/1A OF THE COUNTY OF SAN LUIS OBISPO FLOOD CONTROL AND WATER CONSERVATION DISTRICT. THE MEASURES INCLUDED IN THESE DRAWINGS DESCRIBE THE LOCATIONS AND QUANTITIES OF LEVEE IMPROVEMENTS WITHIN THE ARROYO GRANDE CREEK CHANNEL

Award

Water / Sewer

$1,672,780.00

Public - County

Site Work

30

15

13

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
11
Bidding Soon
276
All Active Projects
123
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

February 12, 2024

img_map_placeholder

Multiple Locations, San Luis Obispo, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.