BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Rockford, Illinois. Completed plans call for the renovation of a municipal facility.

The Lab Building MVAC Upgrade project consists of removal and replacement of air a make-up unit, and lab exhaust fan. The existing building HVAC control will be upgraded from DDC along with the existing phoenix lab control system. Bidder's attention is called to Article 2 - Instructions to Bidders 3.8 requirements for Statement of Qualifications. Bidder must have a permanent business office within forty (40) miles of FRSA's office at 3501 Kishwaukee Street in Rockford, Illinois. Substantial completion (all HVAC equipment installed and fully functional) shall be August 23, 2024. Final completion shall be September 13, 2024. Liquidated damages shall be $300.00 per each consecutive calendar day for each completion date. All construction shall be done in accordance with specifications on file with FRSA, including the General Provisions and Technical Specifications for Sanitary Sewer Construction, Four Rivers Sanitation Authority (Current Edition). Each Proposal must be accompanied by the FRSA Bid Bond form with an acceptable Bid Security attached, in the amount of five percent (5%) of the total bid price. This amount is a guarantee that, if the Proposal is accepted, a Contract will be entered into and its performance properly secured. The final date and time for questions is Friday, December 1, 2023 at 4:30 p.m., Local Time. The final addendum will be issued on Tuesday, December 5, 2023. The successful bidder will be required to furnish a satisfactory Performance Bond in the full amount of the Bid or Proposal. No Bid shall be withdrawn without FRSA's consent for a period of sixty (60) days after the scheduled closing time for receipt of bids. FRSA reserves the right to reject any or all bids, or any part thereof, or to accept any bid or any part thereof, or to waive any formalities in any bids, deemed to be in the best interest of FRSA.

Post-Bid

Municipal

$340,000.00

Public - City

Renovation

19

1

13

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
129
Bidding Soon
2,049
All Active Projects
892
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

January 8, 2024

img_map_placeholder

To Be Determined, Rockford, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.