BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Sanford, Florida. Working plans call for the renovation of a educational facility.

As of August 16, 2024, a design/build firm has been selected and design is in progress. It is estimated the sub-bidding will commence around February 2025, with construction estimated to start in May 2025. *The closed solicitation has been included below for reference: The owner has determined a prequalified list of design build companies. Reference Number 0000335172 Budget: The College's budget for renovating the building systems at the Center for Building Construction is approximately $5,500,000. The scope of any additional laboratory, classroom or office remodels will be determined and budgeted during contract negotiation. The District Board of Trustees of Seminole State College of Florida is requesting qualifications from experienced contractors to provide design-build services for the building-wide renovation and the optional remodel of sections of its Center for Building Construction (Building-D) on the Sanford/Lake Mary Campus. The District Board of Trustees ("Board") of Seminole State College of Florida ("College") located at 100 Weldon Boulevard, Sanford, Florida 32773, in accordance with Florida Statute 287.055 is accepting sealed qualifications ("Statement of Qualifications") from the College's current Prequalified Contractors in response to this Request for Qualifications ("RFQ") for Design Build Services for D Building on the Sanford/Lake Mary Campus. The contracted Firm will work in consult with College faculty, administration and staff, who will outline academic program needs for the building and advise on the College's design, operational and maintenance standards. The Firm will integrate these needs into a design package to be approved by the College and will provide full construction services from planning through project closeout. Question Deadline 12/05/2023 at 12:00 PM ET Questions are submitted online Yes, Questions regarding responses to this Request for Qualifications should be sent via the College's website. General Requirements - Bidder /Preregistration Required - Contractors License Required - Insurance Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Timeline: Following the successful awarding of a contract, design work for the Building-D renovation is expected to begin in Spring 2024. Project construction must be completed and closed out by October 2026. *The District Board of Trustees of Seminole State College of Florida reserves the right to waive minor, nonmaterial irregularities in any or all statements of qualifications and accept or reject, in part or in full, any or all statements of qualifications.

Pre-Construction/Negotiated

Educational

$7,800,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
162
Bidding Soon
2,422
All Active Projects
984
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 20, 2023

May 1, 2025

October 31, 2026

img_map_placeholder

100 Weldon Blvd, Sanford, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.