BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Montgomery, Alabama. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

The scope of work includes full architectural services for a single story building of approximately 12,000 square feet for a new facility. The project may include, but is not limited to, a prefabricated steel structure, slab on grade floor construction, with a masonry or stone veneer applied on the front elevation and metal wall panels, and with a sloped metal roof system. The number of parking spaces is estimated at 45 spaces and concrete paving is preferred. The front fifty percent of the floor area may be open plan area accessible to the public for a lobby space, private driver exam/testing rooms, public restrooms, with suspended lay in ceiling tile and LED lighting. The remaining square footage will be private employee only access areas of open plan for work stations, a conference /training room, open breakroom, and private restrooms with similar finishes as the public space. Design recommendations by the successful design professional should include adherence to the budget and schedule throughout the project duration. The project is not expected to be multiple bid packages. The estimated construction budget for this project is $4,300,000. The term of the agreement will be two years with an option to renew for two (2) additional years. The design services will be contracted under both fees and hourly rates in accordance with the Manual of Procedures of the State of Alabama Department of Finance, Real Property Management, Division of Construction Management (DCM). For questions and additional information, contact Dan Woods via email at dan.woods@realproperty.alabama.gov This request for qualifications is not an offer to contract but seeks the submission of qualifications from qualified, professional respondents that may form the basis for the negotiation of an agreement. The Awarding Authority/Owner reserves the right to reject any or all qualifications and to solicit additional qualifications, through the RFQ process, if that is determined to be in the best interests of the State of Alabama.

Conceptual

Municipal

$4,300,000.00

Public - State/Provincial

New Construction, Site Work

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
423
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2024

img_map_placeholder

Coliseum Blvd, Montgomery, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.