BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Springfield, Illinois. Completed plans call for the renovation of a municipal facility.

Illinois Secretary of State is requesting bids for the replacement of the HVAC system that serves the east wing of the Howlett Building located at 501 S. Second St. Springfield, Il 62756, Sangamon County. Contract Award 12/6/2023 Substantial Completion - 1/31/2025 Final Completion - 3/31/2025 A. Work of the Project includes the following: 1. Provide new VAV HVAC system with new equipment. Total of 6 new AHU serving the East wing of Howlett building floors 1 through 5. Provide new heating and chilled water equipment and piping. Make all required piping, ductwork and electrical connections to the new equipment. Connect new equipment to existing electrical. Provide new controls for all equipment replaced as part of this project. 2. Selective demolition and disposal. 3. Removal of existing ceiling and lighting. Provide new ceiling and lighting installation and selective architectural scope. 4. Integrate new fire alarm devices for new equipment to fire alarm panel. Reinstall existing fire alarm devices related to ceiling work. B. The Contract Documents indicate the Work of the contract and related requirements and conditions that have an impact on the Work. Related requirements and conditions that are indicated on the Contract Documents include, but are not necessarily limited to the following: 1. Existing site conditions and restrictions on use of the Site. With the exception of work listed in this Section, the Contractor may schedule his work in any manner he deems appropriate to complete the contract within the time allowed. The Contractor is cautioned that some of the work may have to be performed during other than normal working hours and that the Owner may revise the schedule whenever the Owner finds it necessary to maintain work progression, or to protect the Owner's facility, or to maintain continuous, satisfactory operation of existing facilities. 2. Following is an anticipated project schedule. Contractor will be responsible for providing an update

Post-Bid

Municipal

$144,000.00

Public - State/Provincial

Renovation

108

14

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
512
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

February 23, 2024

img_map_placeholder

501 S 2nd St, Springfield, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.