BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Renovation of a stadium in Battle Creek, Michigan. Completed plans call for the renovation of a stadium.

The Project consists of the replacement of four (4) rooftop air handling units on grillage steel, as well as four (4) rooftop exhaust fans, and the associated electrical equipment and structural reinforcement. This includes three (3) 100-ton air handling units and one (1) 30-ton air handling unit. The one (1) air handling unit that is not being replaced shall be removed in entirety with ductwork capped on the roof. In addition, the building automation system will be upgraded and replaced to integrate in the City's existing building automation system.

Award

Arenas / Stadiums

$2,309,680.00

Public - City

Renovation

19

12

4

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
158
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 29, 2025

Project location map

1 McCamly St, Battle Creek, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.