Site work and new construction of a municipal facility in Spruce Pine, North Carolina. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Total Project Budget: Not to excelle $2 million Source of Funds: Mayland Community College Foundation Approved OC-25 Physical location for fed ex/ups delivery (delivery address): mayland community college, 200 mayland dr, spruce pine, nc 28777 nc licensing statement: in order to offer construction services (general contracting, electrical contracting, plumbing, heating and fire sprinkler contracting, or landscape contracting) and design services (architecture, engineering, or landscape architecture) as part of the response to this rfq, the proposing firms must be properly licensed to provide construction services and design services in the state of north carolina. More information on the north carolina state boards may be found at the following websites: construction: nc licensing board for general contractors. C State Board of Examiners of Electrical Contractors website. State building commission - selectingcriteria for design-build in selecting the design-builder, the selection committee should take into consideration qualification information expressed by the design-builder in a package that includes the following: 1. Profile of each key firm on the team (design-builder, contractor(s), designer(s), etc.). Include firm history, ownership, description of services, location, staff size and record of successfully completed projects without major legal or technical problems. 2. Resume of each key personnel represented on the team (design-builder, contractor(s), designer(s), etc.). Identify licenses (with numbers) and qualifications. 3. Examples of experience in each of these areas: a. Projects with scope similar to proposed project, successfully completed by team members (firms and/or personnel). B. Designbuild projects successfully delivered by team members (firms and/or personnel). C. Collaboration between team members (firm and/or personnel). 4. Examples of recent experience with estimating project cost. Include examples of design-build projects with comparison between initial design-build estimate and final cost. 5. Examples of recent experience with adhering to project schedules. Include examples of design-build projects with comparison between initial schedule and final delivery date. 6. Understanding of the project location as exhibited by past experience in the geographic area and/or with the client. Indicate team's proximity to the project area. 7. Quantifiable description of current workload and available resources to successfully complete this project. 8. Description, with examples if applicable, of process for successfully delivering this proposed project. Address each phase of project (design, pre-construction and construction). Include strategy for pre-qualifying construction subcontractors and obtaining competitive bidding; practices and procedures to ensure quality; and other factors that may be applicable. 9. Certifications: a. A letter, dated within the last 30 days, from your surety company, signed by their attorney in fact, verifying their willingness to issue sufficient payment and performance bonds for this project, on behalf of your firms or its agent licensed to do business in north carolina, and verifying your company's capability and capacity based on your current value of work. Surety company bond rating shall be rated "a" or better under the a.M. Best rating system or the federal treasury list. B. Hub participation: describe the program (plan) that your company hasdeveloped to encourage participation by HUB firms to meet or exceed the goals set by North Carolina General Statute 143-128.2. Please explain how the firm will address minority participation in the management levels of the company. Include a HUB plan in the proposal. Provide documentation of HUB participation that the firm achieved over the past three (3) years on both public and private construction projects. Outline specific outreach efforts that your firm will take to notify HUB firms of opportunities for participation. Indicate the minority participation goal that you expect to achieve on the project. c. Written certification by the design-builder that each licensed design professional included as part of the team was selected based solely on qualifications without regard to fee. Include evidence that a qualifications-based selection (QBS) process was utilized. 10. Additional information as requested by the Owner or deemed appropriate by the Design-Builder. Proposing firms must submit THREE (3) copies of the qualifications information package. In the interest of costsavings to the Design-Builders, consistency of the submittals and more efficient use of time by the preselection committee, the qualifications information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x11" pages stapled in the upper left-hand corner. The qualifications information package should not exceed forty (40) single-sided pages or twenty (20) double-sided pages, not including the cover. E-mail and Fax submittals will not be accepted. For Design-Build projects, the minimum period of advertisement shall not be less than twenty-one (21) calendar days.

Post-Bid

Municipal

$2,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
57
Bidding Soon
898
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

January 30, 2024

img_map_placeholder

2492 US-19E, Spruce Pine, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.