BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to a museum in Phoenix, Arizona. Conceptual plans call for the addition of a museum; and for the renovation of a museum.

The estimated construction cost is $6.4 million, which excludes exhibit fixture design, fabrication, and installation. CHILDRENS MUSEUM OF PHOENIX GO BOND EXPANSION PROJECT DESCRIPTION On behalf of the Childrens Museum of Phoenix, the City of Phoenix seeks to renovate and upgrade unfinished spaces in the historic Monroe School building. This building was originally constructed in 1913 and is on the National Register of Historic Places. The capital improvement project intends to develop and finish areas that comply with building codes to transition approximately 28,000 square feet of building shell space to public exhibit/event and support staff spaces. In addition to the interior spaces, the selected consultant team may be asked to consult on potential exterior programming and exhibits to existing interior areas. The preliminary project schedule targets the pre-design/design for late 2024 and construction to start the end of Summer 2025, with construction finishing the end of Spring 2026. This timeline is subject to change based on the outcome of the Pre-Design Phase. The consultant team will be responsible for general project administration, schematic design/pre-design phase (30%), design development phase (60%, 90% and 100%), commissioning, cost analysis, construction documents and specifications, and possible construction administration and observation. City Rights. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Museum

$6,400,000.00

Public - City

Addition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
13
Bidding Soon
700
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

215 N 7th St, Phoenix, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.