BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

PortsToronto on the undertaking of a 20-year capital development program at the Airport through a managed growth strategy. The Airport is governed under tripartite agreement (TP), which is set to expire in 2033. An airport master plan that will look at least 20 years into the future will help inform discussions about the TP. PortsToronto will be commissioning the 2024 Airport Master Plan Study as a vital component of the City of Toronto transportation infrastructure in an urban environment, respectful of the needs and aspirations of its neighbours, waterfront agencies and Indigenous treaty rights and interests. As the Airport facilities are being planned, input from the public and business stakeholders is crucial to ensure the Airport reflects the values and needs of residents and businesses, as well as those of travelers visiting the Greater Toronto Area and/or connection through to the rest of Ontario and Canada. TIMELINE: A Request For Proposals from Consultants has been issued by the owner. The awarded consultant will complete the 2024 Airport Master Plan Study. The intent of this undertaking is to provide background data, information and analyses in an enhanced planning setting that will set PortsToronto on course toward a future that captures current and future travel trends, including landside access via modes other than cars. This plan will consider new aircraft technologies and air transportation modes, such as electric vertical takeoff and landing (eVTOL) capabilities and hybrid and electric powerplants. With the proximity of the Airport to the Toronto downtown core and waterfront communities, the master plan must be mindful and forward-thinking in terms of the goal of making the airport cleaner, greener and quieter. With this in mind, the plan will look at current and developing trends toward decarbonization, including plans to implement and monitor the airport vision of being a leading example of coexistence within the community and natural environments. The plan will also look at development opportunities to optimize the limited airside environment and present financially sustainable general aviation facilities that provide for greater efficiency and safety. The master plan will include presenting alternatives, conceptual cost estimates, and risks and opportunities. The Successful Respondent will be provided with PortsTorontos separately contracted noise, air quality and ground traffic consultants. As public consultation is a critical element of the holistic airport planning process, the Successful Respondent will coordinate closely with an independent facilitator and public consultation consultant (hired under separate contract to PortsToronto) to document, report out and manage public meetings. Questions must be submitted in writing prior to December 8 2023. Term: 2024/01/26 12:00:00 AM EST - 2025/03/31 12:00:00 AM EDT. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,519
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2026

img_map_placeholder

2 Eireann Quay, Toronto, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.