EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 9, 2024 at 7:00 PM

Updated October 1, 2024

Site work and environmental remediation for a fire / police facility in Northampton, Pennsylvania. Completed plans call for site work for a fire / police facility; and for environmental remediation for a fire / police facility.

Allen Township will receive sealed bids for the Municipal Complex/Fire Company #1 Environmental Remediation Project located in Allen Township, Northampton County, Pennsylvania. Representatives of the Consultant (Element Environmental Solutions) and the Construction Manager (D'Huy Engineering, Inc.) will provide project details at this meeting. This project is subject to the Pennsylvania Prevailing Wage Act, approved August 15, 1961, P.L. 987 (Act No. 442), as amended and supplemented, and reference is made to the prevailing minimum wage rates applicable to this project which have been promulgated by the Secretary of Labor and Industry. Bidders shall refer to provisions of the Federal and State statutes, rules and regulations dealing with the prevention of environmental pollution and the preservation of the public natural resources that affect the project; said statement of provisions being submitted, as part of the specifications, pursuant to Section 3301 of the Pennsylvania Commonwealth Procurement Code, 62 Pa.C.S. 3301. Owner reserves the unqualified right to reject all bids and the unqualified right to waive informalities and technicalities in the bids. All questions must be submitted in writing as follows. Phone calls are not permitted. All questions must be sent to: Kim LaBrake (kjl@dhuy.com) D'Huy Engineering, Inc.

Bid Results

Fire / Police

$39,794.00

Public - County

Environmental Remediation, Site Work

3

12

11

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 08 - Openings

Division 08 - Openings

Windows, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Tiling, Flooring, Carpeting, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
208
Bidding Soon
3,094
All Active Projects
1,406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

January 8, 2024

img_map_placeholder

3530 Howertown Rd, Northampton, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Municipal Complex/Fire Company #1 Environmental Remediation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.