BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Bolton, Connecticut. Completed plans call for the renovation of a educational facility.

As of January 16, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The Project entails the provisions and installation of a new HVAC BAS electric/computer Control System (a/k/a BMS. BAS, etc.), to replace the existing HVAC BAS Control System at the premises located at 108 Notch Road, Bolton CT.The scope of Work for the Project will include all materials, labor, services, equipment, systems and machinery described in, and as may be reasonably inferable from the Bidding Documents. Generally, the work will include providing a new BAS electric/computer Control System (a/k/a, BMS, BAS, etc.) to replace the existing system. This RFP is for Phase I of a multi-phase project. Each phase will be bid separately and the award of one phase to a bidder has no bearing on the award of subsequent phases. HVAC Building Automation Systems Upgrades Question Deadline 12/05/2023 at 3:00 PM ET Any ambiguities or inconsistencies in the Bidding Documents of which a Bidder becomes aware and all requests for clarification and interpretation of Bidding Documents shall be emailed to the John Butrymovich at jbutrymovich@boltonct.gov Each Bid must be accompanied by a bid security in the form of a Bid Bond, certified in an amount not less than 10% of the base bid except as otherwise expressly provided in the Instruction to Bidders. The successful bidder will be required to provide performance and labor and material payment bonds in the full amount of the agreed contract price. Bidders are advised that a good faith effort is required for participation in this contract by Small Business Enterprises (SBE) and Minority Business Enterprises (MBE). The SBE goal is twenty-five (25) percent of the contract value, with twenty-five (25) percent of that amount (6.25 percent of the overall project) as the MBE goal. Start Construction (on or about): January 8, 2024 Completion of Construction (on or about): April 30, 2024

Award

Educational

$77,670.00

Public - City

Renovation

32

13

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
507
Active Projects
294
Bidding Soon
4,187
All Active Projects
1,841
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.