BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation and addition to an educational facility in College Station, Texas. Design plans call for the addition of a educational facility; and for the renovation of a educational facility.

AMCHS Additions and Renovations - $50.751 million This project would include a two-story building addition to be constructed in the staff parking lot located on the West side of the building. The addition would consist of mostly Science classrooms/labs to meet TEA requirements and in building a weight room similar to the one at CSHS would also be included. Interior renovations to the existing building would include repurposing the current science classrooms and labs, increasing the cafeteria square footage and functionality, creating a larger and renovated black box theater, renovating and adding square footage to the band hall and creating a functional sports medicine, laundry and storage space for athletics. Because of the location of the building addition, this project also includes funding to modify the bus drive and parking lot off of Welsh. CSHS Phase 2 - $62.256 million Phase 2 of College Station High School will include classroom additions, including regular classrooms, science labs, CTE labs, and an art classroom. There will also be an addition of a fine arts orchestra hall, a large ensemble room, and a third gym with additional locker rooms and storage. The existing orchestra hall will be converted to a black box theater. The school district’s bond was approved by the voters and the design firm has been selected. However, it is currently unknown to when a construction manager and general contractor will be contracted with the school district. As of October 3, 2024, further details regarding design completion, firm construction and completion timelines have not been identified.

Design

Educational

$113,007,000.00

Public - City

Addition, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
74
Bidding Soon
2,871
All Active Projects
985
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

img_map_placeholder

1801 Harvey Mitchell Pkwy S, College Station, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.