BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work for a municipal facility in Washington Township, Ohio. Conceptual plans call for site work for a municipal facility.

As of June 11, 2025, this project was cancelled. The owner did not recieved any eligible bids. *The closed solicitation has been included below for reference: The Recreation Department is requesting quotes for the schematic design of Countryside Park, the final design and engineering services for the Phase I Project of Hillside Shelter, and the final design and engineering services for the Phase II Projects of the Gateway Plaza; Loop Road & Parking. Located in Montgomery County, Ohio, Washington Township is a suburb south of Dayton. It encompasses approximately 21 square miles including the unincorporated portion, with a population of 37,444 residents, and the incorporated portion, with a population of 24,240 residents, for a total population of 61,684. Washington Township provides vital local services through its Development Services, Fire, Information Systems, Police, Public Works, and Recreation departments. The Recreation Department, RecPlex, provides recreation opportunities to the communities of Washington Township and the City of Centerville. The RecPlex campus totals 32.7 acres and is home to 21.2 acres of parkland and 115,000 sq. ft. of facilities including RecPlex East, RecPlex West, Town Hall Theatre and Countryside Park. Programs are offered in aquatics, fitness, sports, theater, adult, senior and youth enrichment, and special events. Funding is provided by a local tax levy, patron passes, participant fees, donations, and grants. Program and facility decisions are influenced by a 2021 Strategic Plan and 2022 Park Master Plan. As noted above, in 2022, RecPlex authorized a Park Master Plan for the 21.2-acre Countryside Park. The completed Master Plan is the blueprint for the Washington Township RecPlex will use to implement many of those projects that were of the highest priority. Components include revitalization of the lake, ponds, and streams in the park, as well as infrastructure improvements and facility upgrades. In all, approximately $11M of Master Plan improvements are slated to be completed over the next six years. Total Estimated Probable Cost/Budget Including Design: $1M. Questions DUE November 8, 2023 No later than 4:30pm EDT Answers Posted November 15, 2023 No later than 4:30pm EDT The method of Contractor Selection has not been Determined at this time.

Project Abandoned

Municipal

$1,000,000.00

Public - City

Site Work

16

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
174
Bidding Soon
2,752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

Project location map

Multiple Locations, Washington Township, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.