BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Ironton, Ohio. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

The waterline portion of the project includes the installation of approximately 7,400 linear feet of 10" waterline PVC C900 DR18, 70 linear feet of 6" waterline PVC C900 DR18, 20 linear feet of 12" waterline PVC C900 DR18, valves, hydrant, meters, connection to the existing City of Ironton Water System, a new master meter pit and other necessary appurtenances. The roadway portion of the project includes the complete removal and rebuild of approximately 2,974 CY of the north bound lane on South 3rd Street from Lorain Street to the bridge. The rebuild of the north bound lane will also include the replacement of 665 linear feet of 12" PVC storm piping, 35 linear feet of 10" PVC storm piping, (4) ODOT CB No. 3, and (4) ODOT MH 3. The roadway improvements also include 2" milling and filling of asphalt concrete for approximately 8,467 SY of the south bound lane on South 3rd Street from Lorain Street to the bridge. BIDDER hereby agrees to commence WORK under this Contract on or before a date to be specified in the NOTICE TO PROCEED, be Substantially Complete within 305 consecutive calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions to the Contract and to fully complete the PROJECT within 335 consecutive calendar days after the date the Contract Time commences to run The use of domestic steel is required on this project. The requirements of American Iron & Steel (AIS) and Build America, Buy America (BABA) Acts are part of this project. Federal Davis-Bacon Wage rates are required on this project. A Pre-bid Meeting will not be held for this project. Minority Participation Goal: 2.9% Women Participation Goal: 6.9%

Bid Results

Water / Sewer

$3,355,901.00

Public - City

Paving, Site Work

51

20

2

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
27
Bidding Soon
433
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

July 15, 2024

img_map_placeholder

S 3rd St, Ironton, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.