Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Saint Louis, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of St. Louis, Board of Public Service, is seeking Statements of Qualifications from firms interested in providing professional engineering services for roadway infrastructure improvements. The goal of this project is to transform a portion of Lousiana Avenue into a "calm street" through the installation of various traffic calming measures. The project will extend from Holly Hills Avenue to Meramec Street, a distance of approximately 1.5 miles. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

4

6

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
128
Bidding Soon
1,660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

Project location map

Multiple Locations, Saint Louis, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed