BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work, paving, outdoor lighting, renovation and addition to a stadium in Fort Worth, Texas. Completed plans call for the renovation of a stadium; and for the addition of a 107,000-square-foot, one-story above grade stadium.

The renovation and expansion of the Sheep and Swine Barns at the Will Rogers Memorial Center reflect a commitment to enhancing functionality, comfort, and accessibility while honoring the venue's agricultural heritage. The project includes strategic renovations to both barns and the addition of a modern arena designed to accommodate a wide range of events. Key upgrades include new office spaces and expanded animal wash areas that improve operational efficiency and animal care during exhibitions. A significant enhancement is the integration of a new conditioned lobby and restroom core in the formerly open space between the two barns. This infill transforms the once-disconnected structures into a cohesive, climate-controlled environment. The addition of a truck dock, loading, and staging area improves logistics for event organizers and exhibitors, streamlining the movement of equipment and livestock. These upgrades not only modernize the facility but also enhance the experience for both participants and visitors. The project also features the construction of a new arena with retractable seating, offering a flexible space for shows and demonstrations. New entrances and protective canopies have been added to the South end and along the west wall of the Swine Barn to improve circulation and create inviting access points. The thoughtful blend of architectural updates and programmatic additions positions the Sheep and Swine Center as a more functional, visitor-friendly venue that meets the evolving needs of Fort Worth’s thriving livestock and exhibition community. As of January 15, 2026, the project has been completed. The firm construction and completion timelines were not released.

Occupancy

Arenas / Stadiums

$110,000,000.00

Public - City

Addition, Outdoor Lighting, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

Project location map

3401 W Lancaster Ave, Fort Worth, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.