Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Site work for a sidewalk / parking lot in Park Hills, Missouri. Completed plans call for site work for a sidewalk / parking lot.

Contract documents and plans may be examined at the following location: 1. Office of the Engineer, Taylor Engineering, LLC, 109 East Columbia Street, Farmington, MO 63640 (573) 756-9226 Project Category Code: Concrete Walkway, Curbs Description: The project primarily consists of a 25-stall parking lot extension. Project includes placing suitable fill material, concrete curbing, concrete sidewalk and flume, rip rap and relocate a decorative rock landscaping feature.

Award

Sidewalks / Parking Lot

$131,600.00

Public - County

Site Work

7

11

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
126
Bidding Soon
1,626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

January 8, 2024

Project location map

102 Industrial Dr, Park Hills, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed