Site work and paving for a sidewalk / parking lot in Columbus, Ohio. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of September 12, 2024 all bids for this project were rejected and project is expected to re-bid at a later date. Operation Safewalks - School Sidewalks - Refugee (Noe Bixby to Blue Moon) Question Deadline Jun 27, 2024 All questions concerning this project are to be sent to capitalprojects@columbus.gov. The last day to submit questions will be specified in the IFB; phone calls will not be accepted. PROJECT SPECIFIC NOTES: SEQUENCE OF WORK OPERATIONS: A sequence of work operations for this project shall be completed as follows: 1. Distribute Resident Notification Letters two (2) weeks (three (3) weeks in downtown business district) in advance of performing any work on a street. Failure to provide the required advanced notice will result in a one-hundred (100) dollars per day penalty as detailed in Notification requirements. 2. All curb replacement, ADA wheelchair ramps, and sidewalk replacement shall be completed. a. Nine (9) days permitted for ramp closure, two hundred (200) dollars per day in liquidated damages thereafter. Reinstallation of a removed street sign pole is required within the nine(9) day ramp closure window and subject to the two-hundred (200) dollars per day penalty if not completed 3. No intersection or part of an intersection should have detection interrupted for more than 45 days. Unless otherwise detailed in the construction documents. o See the Traffic Control and Signal Work section of the General Notes 4. All pavement repairs may be completed with concurrence of the Engineer. The Engineer may direct full depth repairs to take place after the milling operation so that pavement condition can be assessed after the surface is removed. Contractor will mark repair areas based on plan details and field direction. 5. Any additional pavement repairs required after the milling shall be completed or as directed by the Engineer.6. Installation of asphalt transitions. Provide transitions 7. Application of Tack Coat or Stress Absorbing Membrane Interlayer. 8. The placement of the asphalt leveling course (if required).

Final Planning

Sidewalks / Parking Lot

$4,898,096.00

Public - City

Paving, Site Work

205

4

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
43
Bidding Soon
1,184
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

March 12, 2025

img_map_placeholder

Refugee Rd, Columbus, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.