Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2024 at 8:00 PM
Updated May 4, 2024
Renovation of a water / sewer project in Richmond, Texas. Completed plans call for the renovation of a water / sewer project.
Surface preparation and application of protective coating for the interior and exterior of the elevated storage tank and surface preparation and application of protective coatings to the GAC vessels and all associated piping valves and fittings. The deadline to ask questions is 12/12/2023 2:00 PM CST A. Work under this contract includes: Surface preparation and application of protective coating for the interior and exterior of the elevated storage tank and surface preparation and application of protective costings to the GAC vessels and all associated piping valves and fittings. 1.02 ACCESS: A. Project site is accessible as illustrated on the vicinity map and location map included in the construction plans. B. The Work shall be performed on land owned by the Owner. Should the Contractor require use of additional space or construction easements, Contractor shall make arrangements with the proper parties. 1.03 CONTRACTOR INTERFACE: A. The Supplementary Conditions describe other activities, which may be under way simultaneously with the construction under this contract. The Contractor should be aware of issues relating to site accessibility as a result of the related construction activities described in the Supplementary Conditions. B. The Contractor shall be required to coordinate with the Owneris operator for the referenced activities as required to facilitate construction and this shall be incidental to the other bid items. 1.04 EXISTING UTILITIES: A. It shall be the Contractor's responsibility to protect and save from damage all utilities, public or private, which are crossed by his construction operations whether shown on the drawings or not. Where existing utilities are cut, broken or damaged, the Contractor shall be responsible for the immediate repair of the utility with the same type of material or better at his own cost and expense. B. Where utilities such as underground power, telephone or gas lines are exposed by the Contractor and are in conflict with the proposed construction, the Contractor shall notify the respective utility Owner and they shall be lowered or relocated by the respective Owners at no cost to the Contractor. 1.05 UTILITY SERVICES FOR CONSTRUCTION: A. Contractor to make own arrangements of any utility services required for construction. Expense of utility services will be paid for by Contractor. 1.06 PROTECTIVE MEASURES: A. Where construction creates hazard to traffic or public safety, the Contractor shall furnish and maintain suitable barricades, warning signs, and light. Remove same when no longer necessary : Submit all questions via CivCast. Any emailed questions will not be answered. All questions must be submitted by Friday, December 8, 2023 by 2:00 p.m. Any questions submitted or emailed after that date will not be answered.
Award
Water / Sewer
$454,750.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
