Renovation of a power facility in La Verkin, Utah. Working plans call for the renovation of a power facility.
As of January 10, 2024 project is on hold, no definite date for the rebid. Washington County is seeking proposals for a roof replacement and structural preservation on the Hydroelectric Power Plant located in Confluence Park. BACKGROUND INFORMATION Constructed in 1929, the La Verkin Hydroelectric Plant is located on the north bank of the Virgin iver in Confluence Park, about 20 miles northeast from St. George, Washington County. The power plant is a two story square brick masonry building facing west and resting on a poured formed concrete foundation. Since its construction, the plant has had minimal alteration and retains the majority of its historic integrity, view shed, setting and associated feeling. Below the Floor framing the walls are Three Wythe Un-Reinforced Masonry Walls. Above the Floor framing the walls are Two Wythe Un-Reinforced Masonry Walls. At the level of the window lintels on each floor is a soldier bond brick water table that is flush with the wall and extends across all elevations. The building has a medium pitched gable roof with the ridgeline extending east to west clad with terra cotta tiles-although many of the tiles are broken or missing. It overhangs the building about one foot on the north and south elevations and features exposed rafters. To preserve the building from further deterioration, the County wishes to replace the roof in order to shield it from the elements. This should also protect future restoration efforts. Structural and Seismic Studies have been conducted. Please review the attached structural preservation documents and use them to come up with your proposal. Contractor shall provide the needed materials to complete the restoration Work needed includes, but may not be limited to: 1. Repair broken or damaged floor joists Per the Structural Plans. 2. Repair broken or damaged 1x decking. 3. Provide 3/4" APA rated flooring per General Structural Notes. 4. Provide Out-Of-Plane FLOOR anchorage per Structural Plans. 5. Remove all Un-Reinforced masonry chimneys. 6. Remove roofing, Roof Joists, and Ceiling Joists. 7. Provide shoring as required on upper floor walls during construction for safety. 8. Remove lath & plaster from all wood framed walls and provide 1/2" gypsum board finish. 9. Maintain lath & plaster on all exterior URM (Un-Reinforced Masonry) walls. 10. Provide New Roof Trusses and anchor to URM walls per Structural Plans. 11. Sheath New Roof Trusses per Structural Plans. 12. Provide Out-Of-Plane ROOF anchorage per Structural Plans. 13. Provide Corrugated Roofing to rust per Washington County Specifications. 14. Re-point & Repair deteriorated mortar joints all walls exterior & interior 15. Repair Broken, deteriorated, or missing bricks all walls exterior & interior Please see the attached structural and seismic documents. For additional information please contact: Cameron Rognan Habitat Conservation Plan p: (435) 301-7431 m: (435) 705-4431 a: 111 E Tabernacle St., St. George, UT 84770 e:cameron.rognan@washco.utah.gov
Final Planning
Power Plant
$750,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2023
July 10, 2024
To Be Determined, La Verkin, UT
Related To This Project
La Verkin, UT
Bid Date: Sep 12 2024
La Verkin, UT
Bid Date: Dec 05 2023
La Verkin, UT
Bid Date: Aug 04 2022
La Verkin, UT
Bid Date: Apr 06 2022
La Verkin, UT
Bid Date: Apr 06 2022
Springdale, UT
Bid Date: Dec 11 2023
Park City, UT
--
Salt Lake City, UT
Bid Date: Dec 08 2023
Riverdale, UT
Bid Date: Dec 08 2023
Washington, UT
Bid Date: Dec 13 2023
Salt Lake City, UT
Bid Date: Dec 08 2023
Cove, UT
Bid Date: Dec 12 2023
Logan, UT
Bid Date: Dec 12 2023
Eden, UT
Bid Date: Nov 29 2023
Ogden, UT
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.