Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work and paving for a mixed-use development in Toronto, Ontario. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work will include, but is not necessarily limited to, the supply of all labour, material, supervision and equipment necessary to implement the Project as per the detailed design drawing set prepared by Dillon Consulting. The detailed design for the Project consists of but is not necessarily limited to the following general components: - Site clearing, grubbing; - Installation of perimeter safety fence, construction signage, erosion and sediment controls and tree protection as required for approximately 850 m of trail; - Installation, maintenance and removal of temporary access roads, storage and staging areas; - Site grading, cut/fill, haulage and off-site disposal of surplus excavated material; - Proper decommissioning of existing monitoring wells; - Removal and disposal of existing concrete within Highland Creek tributary where necessary to facilitate temporary and permanent bridge installation; -Design/build for bonding/grounding system for installation of trail amenities within the existing Hydro corridor; -Installation of granular base and asphalt paving of 4,285 sqm of trail including resting nodes, signage and line painting; - Supply and Place Wood Guard Rail fence - Engineering design, fabrication, delivery and erection of steel bowstring arch bridge - Steel railings - Dewatering and construction of reinforced concrete substructures and approach slabs - Design, supply and installation of helical pile foundations for bridge - Temporary modular work bridge - Implementation of signalized at-grade pedestrian crossing at Midland Avenue - Site restoration including; fine grading, topsoil, seeding and plantings as required. - Installation of required warning signage, removable bollard(s), and final fencing. An RFT was subsequently issued to the following six (6) pre-qualified suppliers. A mandatory meeting and site tour was held on October 22, 2024. 1. Bronte Construction 2. Dynex Construction Inc. 3. Hawkins Contracting Services Ltd. 4. McPherson-Andrews Contracting Limited 5. Metric Contracting Services Corporation 6. Rutherford Contracting Ltd.

Award

Roads / Highways

$2,133,770.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
189
Bidding Soon
5,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

May 5, 2025

Project location map

Meadoway Multi-Use Trail, Toronto, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.