BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Shamrock, Texas. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: two new 500,000 gallon ground storage tanks, disinfection systems, and appurtenances. A. Install two new 500,000 gallon AWWA D110 Type 3 Precast Wirewound Prestressed Concrete storage tanks. B. Install two new chlorination systems and fiberglass buildings. C. Install yard piping and appurtenances. D. Demolish existing steel ground storage tanks, appurtenances, chlorine buildings and other associated improvements. Question Deadline: 12/16/2023, Please submit questions for this project 72 hours prior to bid opening through electronically. Owner anticipates that the Project's total bid price will be approximately $2,200,000. The Project has an expected duration of substantial completion within 300 calendar days and final completion within 330 calendar days. Liquidated damages: $1,000 per day Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis, minor components, and Pig iron and direct reduced iron waiver { } apply to this contract. Doc notes :Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Scanned copies of the Bidding Documents may be picked up from the Issuing Office by paying a nonrefundable fee of $ for each set.c

Award

Water / Sewer

$4,087,000.00

Public - City

Site Work

34

24

11

10

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
4
Bidding Soon
53
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

April 1, 2024

img_map_placeholder

To Be Determined, Shamrock, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.