BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work and paving for a road / highway in Indiantown, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 5, 2025, the project is in design and construction has not been funded. A general contractor or a selection method has not been selected. Construction is expected to begin in July of 2031. FPID: 453333-1 The project involves the reconstruction of State Road (SR) 710/Warfield Boulevard from east of SW FPL Martin Power Plant Road (MP 9.771) to west of SW Allapattah Road (MP 14.872) in Martin County, Florida. The overall project length is 5.101 miles primarily within unincorporated Martin County and adjacent to the Village of Indiantown. SR 710/SW Warfield Boulevard is a two-lane (one lane in each direction), undivided roadway with a posted speed limit of 60 mph. The corridor includes 12 ft travel lanes with flushed shoulders. The roadway has a functional classification of rural principal arterial from MP 9.771 to MP 12.565 and urban rural principal arterial from MP 12.565 to MP 14.872 with a context classification of C2-Rural. SR 710/Warfield Boulevard is a freight corridor vital to the local and statewide economy and identified as a strategic intermodal system (SIS) facility. The proposed improvements include reconstruction of the existing roadway to widen from a two-lane undivided roadway to a four-lane divided roadway. The proposed typical section includes two 12-ft lanes in each direction separated by a 40-ft median with 12-ft outside shoulders (5-ft paved) and 8-ft inside shoulders (5-ft paved). A 12-ft shared use path will also be provided on the north side of the roadway. In addition, improvements to the major connecting side streets will be provided to enhance safety. *The closed solicitation has been included below for reference: District : 04 Selection Method : Letter of Response and Interview Project Description : SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road Plain Language Description : Design Services for SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road. Advertisement Date 1/09/2024 Response Deadline Date/Time 1/24/2024 03:30 am Shortlist Selection Date/Time 2/12/2024 07:45 pm Final Selection Date/Time 3/18/2024 06:45 pm Negotiations Period Begin Date 3/23/2024 Negotiations Period Ending Date 5/25/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road

Design

Roads / Highways

$9,265,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
115
Bidding Soon
1,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2031

Project location map

FL-710, Indiantown, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.