BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2023 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Avon Park, Florida. Contact the soliciting agency for additional information.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 07 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : TBNext Survey Support Services - continuing Plain Language Description : Consultant Services authorized by Task Work Orders to provide a range of Survey Services. Control Surveying - Horizontal and Vertical Project Network Control to specified standards. Design, Right of Way, and Construction Surveying - Boundary Surveys, Right of Way Surveys (includes alignment retracements), as-built surveys, construction layout surveys, topographic surveys, hydrographic surveys, quantity surveys, record surveys, mean high water line surveys, and special purpose surveys. Photogrammetric - perform photogrammetric tasks in accordance with all applicable statutes, manuals, guidelines, standards, handbooks, procedures, and current design memoranda, resulting in maps and photographic products. Right of Way Mapping - Production of Right of Way related maps, (to include but not limited to, Right of Way Control Surveys, Right of Way Maps, and Maintenance Maps), legal descriptions and sketches of legal descriptions based on information supported by applicable surveys or maps, title search and other document review and interpretation. All work is to be certified by a Professional Surveyor and Mapper, licensed in the state of Florida. Response Deadline Date/Time 1/23/2024 Response Deadline Date/Time 2/06/2024 03:30 am Shortlist Selection Date/Time 2/19/2024 08:00 pm Phase II Submittal Deadline Date/Time 3/05/2024 01:30 am Technical Review Committee Meeting 1 Date/Time 3/06/2024 01:30 am Final Selection Date/Time 3/11/2024 07:00 pm Negotiations Period Begin Date 3/26/2024 Negotiations Period Ending Date 4/27/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP - TBNext Survey Support Services - Continuing

Conceptual

Roads / Highways

$5,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
157
Bidding Soon
2,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.