BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Baraboo, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

In general, this request for bids is for services and equipment involved HMA 4MT58-28 Paving Binder, HMA 4MT58-28 Paving Surface, Tack Coat, Cold-In-Place Recycling, 3/4 " Base Aggregate Dense, Removing Pavement Butt Joints, and Traffic Control as outlined in the documents listed in the table of contents. It is required that the work to be done under this contract be completed by June 30, 2024, but a contract extension shall be at the discretion of the Highway Commissioner. Time is of the essence regarding the completion deadline, and all other deadlines specified herein. Unless a written extension is granted, all work shall be completed by the end of June 2024. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 10% of the bid price. The bid will be awarded at a meeting of the Highway Committee on December 12 OR 13, 2023 at 5:00 pm or as soon as the matter may be heard. This is an LRIP project using CHIP funds, all bids for this project are subject to applicable public bidding laws of Wisconsin. There will be no pre-bid meeting for this project. The successful bidder must furnish a 100% Performance Bond and a 100% Payment Bond in the contract sum with a corporate surety approved by the Owner (Sauk County). Selection of the contractor will be based upon bidder qualifications, including but not limited to evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest properly responsive, responsible and eligible bidder. Contractors submitting bids must perform at least 50% of the work outlined in the bid documents. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids. Sauk County reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the County. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Result - Option 1 - D.L. Gasser Construction - $1,212,304.18 Option 2 - Scott Construction, INC - $1,276,016.50

Award

Roads / Highways

$2,488,321.00

Public - County

Paving, Site Work

6

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
533
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

January 10, 2024

img_map_placeholder

Multiple Locations, Baraboo, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.