Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Iron Mountain, Michigan. Design plans call for the construction of a medical facility; and for site work for a medical facility.
As of October 25, 2024, a design firm has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330 ARCHITECT-ENGINEER QUALIFICATIONS PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE, ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. 1. GENERAL INFORMATION Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, and reports, and construction period services for Project # 585-338 Minor Design at The Oscar G. Johnson Veteran Affairs Medical Center (OGJ VAMC) located at 325 East H Street, Iron Mountain, Michigan. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation (FAR) subpart 36.6 "Architectural and Engineering Services," VA Acquisition Regulation (VAAR) 836.6, and VA Acquisition Manual (VAAM) M836.6 Architect-Engineer Services. In accordance with FAR 36.209, "Construction Contracts with Architect-Engineer Firms," no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. 2. PROJECT INFORMATION This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The NAICS code for this procurement is 541330 "Engineering Services" and the annual small business size standard is $25.5M. A full design team is required to complete this project. The VA expects to award the anticipated A-E contract in early May 2024. The anticipated period of performance for completion of design is 365 calendar days after notice of award (NOA). The VAAR magnitude of construction is between $10,000,000 and $20,000,000. Please note that the 365-calendar-day period of performance for the design completion begins with the issuance of the NOA and that a notice to proceed (NTP) will not be issued for the completion of a design project. 3. A-E SELECTION PROCESS Firms submitting SF 330s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this pre-solicitation notice. These evaluations will determine the most highly qualified firms for this requirement. In accordance with FAR 36.602-3(c), at least three of the most highly qualified firms will then be notified of the Government's intent to hold discussions. All firms not invited to participate in discussions will be notified at this time. In accordance with FAR 36.607(b), any requested debriefings of successful and unsuccessful firms will be held after final selection has taken place and will be conducted, to the extent practicable, in accordance with 15.503, 15.506(b) through (f), and 15.507(c). Note that 15.506(d)(2) through (d)(5) do not apply to architect-engineer contracts. Discussions will be held with the most highly qualified firms in the form of written responses. The firms invited to participate in discussions will be notified by email and provided further instructions, including any questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked based on the primary and (if necessary) secondary selection criteria. The final evaluation and ranking will consider the SF 330 submission for each firm, as well as additional information obtained via discussions. The highest rated firm will be selected to receive the solicitation and engage in negotiations. The solicitation will be issued to the highest rated firm as a Request for Fee Proposal (RFP). All SOW attachments and site-specific documentation will be provided to the highest rated firm with the RFP. A site visit will be authorized during the negotiation process. An award will then be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. If negotiations with the highest rated firm are unsuccessful, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until award can be made. 4. SELECTION CRITERIA Firms responding to this notice will be evaluated and ranked using the primary and secondary selection criteria listed below. The factors are listed in descending order of importance. The evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Professional Qualifications: Necessary for satisfactory performance of required service. The design firm and A-E on staff representing the project or signing drawings in each discipline must be licensed to practice in any one of the United States of America. The design firm must provide professional license numbers and/or proof of licensure upon submission. The evaluation shall consider the specific experience (minimum of five years) and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full-time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the state where the project is located. Key positions and disciplines required for this project include but are not limited to: Architect (LEED certified), CADD Technician, Registered Communications Distribution Designer (RCDD), Estimator, Civil Engineer, Electrical Engineer, Environmental Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Plumbing, Project Manager, Quality Assurance, Structural Engineer, and Physical Security Specialists. Offeror must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ___________________, [company] __________________, certify that the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not VIP-listed SDVOSBs in compliance of 48 CFR 852.219-73. The information provided in sections C through E of SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Specialized experience and technical competence: In the design and construction period services provided for clinic design. Project experience should include fiber optics, data cable, Data Center/Server Room, electrical, HVAC, fire protection, and physical security. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation, transition, and sustainable design practices. Include no more than six government and private experience projects similar in size, scope, and complexity, and experience with the types of projects above. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects, and familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. The information provided in sections F and G of SF 330 will be used to evaluate this factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Capacity: The capacity to accomplish work in the required time. The evaluation will consider the team's plan and overall ability to meet the schedule of the project, as well as the available capacity of personnel in key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded by the VA during the previous 12 months and the full potential value of any current indefinite delivery contracts. Offeror shall clearly state their available capacity presenting workload percentages for the key disciplines and/or team members. Also, the offeror must provide the completion percentages and expected completion date for the VA projects awarded in the previous 12 months. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies toward the team/personnel provided in the SF 330. Past performance: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. The past performance will be evaluated for all projects provided in section F to include a review of Contractor Performance Assessment Rating System (CPARS). The following information is required for all projects noted in section F: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Evaluations will consider superior performance ratings on recently completed projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. *Completed PPQs should be incorporated into the SF330 directly. PPQs should not be submitted to VHA PCAC directly. The PPQs will be counted towards the page limitations for this submission. Knowledge of the locality: Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, working with and local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. Note that the intent of this factor is to showcase a firm's understanding of the site and locality, and not where the firm is located and how they would travel to the site. Information related to the firm's location, shall be provided in section H, under Secondary Selection Criteria Factor 1. Experience in construction period services: To include solicitation support services, professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, support of construction contract changes to include drafting statements of work and cost estimates, attendance at weekly conference calls, providing minutes of meetings between the AE, VA, and contractors, pre-final inspection site visits, generation of punch-list reports, commissioning services and production of as-built documentation. The information for this factor shall be provided in Section H of the SF 330. SECONDARY SELECTION CRITERIA Geographic location: Location of the firm, as measured by the driving distance (miles) between the offeror's principal business location and the Oscar G Johnson VA Medical Center located at 325 East H Street in Iron Mountain, MI 49801. Determination of the mileage will be based on Google Maps (https://www.google.com/maps/dir/). *The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm's SF 330 submission "highly qualified" or "not highly qualified." 5. SUBMISSION REQUIREMENTS The below information contains the instructions and format that must be followed for the submission of the SF 330 Statement of Qualifications: Submit ONE (1) SF 330 Statement of Qualifications to Contract Specialist Doniver G. Hamilton at Doniver.Hamilton@va.gov and Contract Officer Gabriel D. Escarciga at Gabriel.Escarciga@va.gov. This must include Parts I and II and any applicable attachments. The submission must include the SF 330, Architect-Engineer Qualifications (form is available online at https://www.gsa.gov/reference/forms/architectengineer-qualifications ). The SF 330 submission is due by 5:00 PM ET on February 8, 2024. The SF 330 must be submitted in one email and have a file size no larger than 5 MB. No hard copies will be accepted. The subject line of the email must read: "SF 330 Submission - 36C77624AP0193 Minor Design 585-338 Construct Whole Health Building Iron Mountain, MI." The SF 330 submission must not exceed a total of 50 pages. This includes title page, table of contents, and any other relevant information. Any pages submitted by an offeror that exceed the limit will not be considered during the evaluation. Each page must be in Arial size 12 font, single spaced. Part II of the SF 330 and any CPARs or PPQs will NOT count toward the page limitation. A PPQ obtained for another SF 330 submission may be submitted for this project. However, if significant portions of the project have been completed since the PPQ was filled out, a new PPQ should be submitted to accurately assess the project. Firms must include the following information in section B of the SF 330 submission: 1) SAM Unique Entity Identifier 2) Tax ID number 3) Cage code 4) Primary point of contact's email address and phone number All questions must be submitted to the CS & CO email with the subject line "SF 330 Questions - Minor Design, Construct Whole Health, Iron Mountain, MI." The cutoff for question submission is 5:00 PM ET on January 18, 2024. Questions will be answered through modification to the pre-sol notice posted to Contract Opportunities at SAM.gov. This procurement is a 100% set-aside for SDVOSB concerns. Offers received from other than SDVOSBs will not be considered. Offerors must be certified as SDVOSBs by the U.S. Small Business Administration (SBA) and visible in the Veteran Small Business Certification (VetCert) database (https://veterans.certify.sba.gov/) at the time of SF 330 submission, written response submission, and award. Failure to be certified in the VetCert database at these times will result in the offeror being deemed ineligible for award. All joint ventures must be SBA certified at the time of SF 330 submission, written response submission, and award and must submit agreements that comply with 13 CFR 128.402 prior to contract award. All prime firms must meet the NAICS code requirement specified in this notice. The Contracting Officer will verify the NAICS code in VetCert. Failure to meet the NAICS code requirement may result in the rejection of the SF 330 submission. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror's responsibility to check the Contract Opportunities website at SAM.gov for any revisions to this announcement prior to submitting their SF 330. See attached document: SOW Construct Whole Health Center. See attached document: SOW WHC Space Diagram Model. See attached document: Past Performance Questionnaire. See attached document: Post Award Specs-Drawings Review Checklist. End of Document The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Medical
$20,000,000.00
Public - Federal
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2025
325 E H St, Iron Mountain, MI
Related To This Project
Iron Mountain, MI
Bid Date: Mar 18 2024
Iron Mountain, MI
Bid Date: Dec 19 2023
Iron Mountain, MI
--
Iron Mountain, MI
Bid Date: Feb 05 2024
Iron Mountain, MI
Bid Date: Feb 27 2024
Iron Mountain, MI
Bid Date: Mar 18 2024
Iron Mountain, MI
Bid Date: Mar 18 2024
Iron Mountain, MI
Bid Date: Mar 25 2024
Iron Mountain, MI
Bid Date: Oct 16 2023
Iron Mountain, MI
--
Iron Mountain, MI
Bid Date: Sep 06 2022
Iron Mountain, MI
--
Iron Mountain, MI
Bid Date: Sep 18 2023
Iron Mountain, MI
Bid Date: Jan 14 2022
Iron Mountain, MI
Bid Date: Feb 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.