Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2023 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Cedar Key, Florida. Contact the soliciting agency for additional information.
In accordance with section 287.055, Florida Statutes, known as the Consultants Competitive Negotiation Act (CCNA), the Cedar Key Water and Sewer District ("District") is seeking Proposals from qualifying consulting firms (the "Proposer") to provide all or a portion of professional consulting services ("Professional Services") for engineering, construction engineering inspection, and surveying/mapping services related to water and wastewater utility system ("System") improvements and repairs to be undertaken by the District stemming from damages suffered from Hurricane Idalia (including hazard mitigation projects). The District anticipates selecting one or more professional firms to execute a Contract for Professional Services in accordance with this RFQ. The CCNA establishes contracting procedures by which agencies must select architects, professional engineers, landscape architects, and surveyors and mappers ("Professional Firms"). The CCNA process allows for Professional Firms to be chosen based on quality of personnel, minority/women-owned business enterprise consideration, past performance, willingness to meet time and budget requirements, location, workload and volume of work previously awarded to each Professional Firm by the District. The selected firms must be capable of providing all or a portion of the Professional Services set forth in the RFQ as well as providing deign, permitting, and construction oversight as may be required by the District based on each specific project for which services are needed. While every effort is made to ensure the accuracy and completeness of information in the RFQ, it is recognized that the information may not be complete in every detail and that all work may not be expressly mentioned in the RFQ. It is the responsibility of the Proposer to include in its Proposal all pertinent information in accordance with the objectives of the RFQ. Questions Due from Prospective Respondents December 7, 2023 Responses to questions due December 15, 2023 Commencement of Services by Successful Respondent January-March, 2024 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
