BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Improvements of the Weil Avenue, Wilshusen Avenue & St. Vincent Avenue Improvements All questions concerning the bid document preparation can be directed to Mr. Elliot Brown, City of Shrewsbury at 314-647-5795. Project specific questions can be directed to Mr. Brendan Weis, Weis Design Group at 636-207-0832. Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify Mr. Elliot Brown, City of Shrewsbury at 314-647-5795 or through Missouri Relay System, TDD 1-800-735-2966, at least five (5) working days prior to the bid opening The proposed work includes the furnishing of materials, tools, equipment and labor necessary for the construction of approximately 0.69 miles of street milling, average 2" fibrous asphalt overlay, sidewalk reconstruction and ADA ramps in accordance with the plans and specifications and other items identified in the contract documents. The contractor is responsible for all items of work necessary to complete the project. Each bid must be accompanied by a cashier's check or certified check, or a Bid Bond executed by the BIDDER and an approved surety company and payable to the CITY, in an amount not less than five percent (5%) of the sum total of the base bid. Not less than the prevailing hourly rates of wages that the higher of State or Federal Wage Rates shall prevail, or determined by court on appeal, shall be paid to all workers performing work under this Contract. The DBE goal for this letting is a minimum 10% of the total contract amount. All BIDDERS must meet the MoDOT requirements as a CONTRACTOR prior to bid opening in accordance with the Missouri Standard Specification Book for Highway Construction. A Performance Bond and Payment and Materials Bond are required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.The project budget is between $390K and $420K

Bid Results

Sidewalks / Parking Lot

$411,894.00

Public - City

Paving, Site Work

14

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
37
Bidding Soon
784
All Active Projects
303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

January 12, 2024

img_map_placeholder

Multiple Locations, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.