BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.

Bullard High School Gyms HVAC Improvement Project, to Section A - replace make up air units with package units in the South gym and Section B - Air handling units and chiller at the North gym. Question Deadline 12/08/2023 at 5:00 PM PT DISTRICT hereby notifies all bidders that they will affirmatively ensure that in any Contract entered into pursuant to this advertisement, disabled veteran business enterprises (DVBE) will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, creed, sex or national origin in consideration for award. The DVBE goal for the project is as follows: three percent (3%) of the dollar amount of the Contract. Prime Contractor must have a valid Class "B" Contractor's License Bids shall be accompanied by a certified check, cashier's check, or a bidder's bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. For purpose of prequalification, Electrical, Mechanical, and Plumbing Contractors are Contractors pursuant to Section 7058 of the Business and Professions Code inclusive of: C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses. Prequalified Prime Contractor may selfperform electrical, plumbing, mechanical work if prequalified under applicable licenses. Prequalification applications are to be submitted through online no later than 5:00 PM, December 7, 2023. Prequalification status is valid for one (1) calendar year for any subsequent projects requiring prequalification. THIS PROJECT CONSISTS OF THE REPLACEMENT OF TWO (2) INDOOR/OUTDOOR SPLIT SYSTEM UNITS WITH FILTER MODULES, THE NEW INSTALLATION OF ONE (1) HEATING/COOLING PACKAGE UNIT, SIX (6) GRAVITY VENTILATORS, AND TWO (2) FAN COILS AT BUILDING A AND THE REPLACEMENT OF ONE (1) AIR-COOLED CHILLER, ONE (1) CHILLED WATER PUMP, THREE (3) AIR HANDLER UNITS, AND THREE (3) EXHAUST FAN UNITS AT BUILDING C. ALSO, INCLUDED IS THE INTEGRATION OF ALL EXISTING HVAC EQUIPMENT INTO THE NEW FX-80 EMS SYSTEM, THE UPGRADE OF THE PANEL AT BUILDING BB, AND THE ADDITION OF A NEW CMU WALL AROUND THE PACKAGE UNIT AT BUILDING A. ARCHITECTURAL, ELECTRICAL, AND STRUCTURAL SCOPE IS ONLY INCLUDED AS IT PERTAINS TO THE HVAC EQUIPMENT

Award

Educational

$3,165,000.00

Public - City

Renovation

56

20

4

6

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
24
Bidding Soon
411
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

February 14, 2024

img_map_placeholder

5445 N Palm Ave, Fresno, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.